04.08.2013 Views

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13 Signing <strong>of</strong> the Contract: 13.1 The successful tenderer shall be required to execute an AGREEMENT<br />

in the pr<strong>of</strong>orma attached with TENDER DOCUMENT within 15 days <strong>of</strong><br />

the receipt by him <strong>of</strong> the Notification <strong>of</strong> Acceptance <strong>of</strong> Tender. In the<br />

event <strong>of</strong> failure on the part <strong>of</strong> the successful tenderer to sign the<br />

AGREEMENT within the above stipulated period, the Earnest Money<br />

or his initial deposit will be <strong>for</strong>efeited and the acceptance <strong>of</strong> the tender<br />

shall be considered as cancelled.<br />

14 Field Management &<br />

Controlling/Coordinating<br />

Authority:<br />

15 Note to Schedule <strong>of</strong><br />

Rates:<br />

16 Policy <strong>for</strong> Tenders Under<br />

Consideration:<br />

14.1 The field management will be the responsibility <strong>of</strong> the<br />

ENGINEER-IN-CHARGE, who will be nominated by the EMPLOYER.<br />

The ENGINEER-IN-CHARGE may also authorise his representatives<br />

to assist in per<strong>for</strong>ming his duties and functions.<br />

14.2 The ENGINEER-IN-CHARGE shall coordinate the works <strong>of</strong> various<br />

agencies engaged at site to ensure minimum disruption <strong>of</strong> work carried<br />

out by different agencies. It shall be the responsibility <strong>of</strong> the<br />

CONTRACTOR to plan and execute the work strictly in accordance<br />

with site instructions to avoid hindrance to the work being executed by<br />

other agencies.<br />

15.1 The Schedule <strong>of</strong> Rates should be read in conjunction with all the other<br />

sections <strong>of</strong> the tender.<br />

15.2 The tenderer shall be deemed to have studied the DRAWINGS,<br />

SPECIFICATIONS and details <strong>of</strong> work to be done within TIME<br />

SCHEDULE and to have aquainted himself <strong>of</strong> the condition prevailing<br />

at site.<br />

15.3 Rates must be filled in the Schedule <strong>of</strong> Rates <strong>of</strong> original Tender<br />

Documents. If quoted in separate typed sheets no variation in item<br />

description or specification shall be accepted. Any exceptions taken by<br />

the tenderer to the Schedule <strong>of</strong> Rates shall be brought out in the terms<br />

and conditions <strong>of</strong> the <strong>of</strong>fer.<br />

15.4 The quantities shown against the various items are only approximate.<br />

Any increase or decrease in the quantities shall not <strong>for</strong>m the basis <strong>of</strong><br />

alteration <strong>of</strong> the rates quoted and accepted.<br />

15.5 The EMPLOYER reserves the right to interpolate the rates <strong>for</strong> such<br />

items <strong>of</strong> work falling between similar items <strong>of</strong> lower and higher<br />

magnitude.<br />

16.1 Only Those Tenders which are complete in all respects and are strictly<br />

in accordance with the Terms and Conditions and Technical<br />

Specifications <strong>of</strong> Tender Document, shall be considered <strong>for</strong> evaluation.<br />

Such Tenders shall be deemed to be under consideration immediately<br />

after opening <strong>of</strong> Tender and until such time an <strong>of</strong>ficial intimation <strong>of</strong><br />

acceptance /rejection <strong>of</strong> Tender is made by <strong>GAIL</strong> to the Bidder.<br />

16.2 Zero Deviation: Bidders to note that this is a ZERO DEVIATION<br />

TENDER. <strong>GAIL</strong> will appreciate submission <strong>of</strong> <strong>of</strong>fer based on the<br />

terms and conditions in the enclosed General Conditions <strong>of</strong> Contract<br />

(GCC), Special Conditions <strong>of</strong> Contract (SCC), Instructions to<br />

Bidders (ITB), Scope <strong>of</strong> Work, technical specifications etc. to avoid<br />

wastage <strong>of</strong> time and money in seeking clarifications on technical/<br />

commercial aspects <strong>of</strong> the <strong>of</strong>fer. Bidder may note that no technical<br />

and commercial clarifications will be sought <strong>for</strong> after the receipt <strong>of</strong><br />

the bids. In case <strong>of</strong> any deviation/noncon<strong>for</strong>mity observed in the bid,<br />

Page 67 <strong>of</strong> 158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!