Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
13 Signing <strong>of</strong> the Contract: 13.1 The successful tenderer shall be required to execute an AGREEMENT<br />
in the pr<strong>of</strong>orma attached with TENDER DOCUMENT within 15 days <strong>of</strong><br />
the receipt by him <strong>of</strong> the Notification <strong>of</strong> Acceptance <strong>of</strong> Tender. In the<br />
event <strong>of</strong> failure on the part <strong>of</strong> the successful tenderer to sign the<br />
AGREEMENT within the above stipulated period, the Earnest Money<br />
or his initial deposit will be <strong>for</strong>efeited and the acceptance <strong>of</strong> the tender<br />
shall be considered as cancelled.<br />
14 Field Management &<br />
Controlling/Coordinating<br />
Authority:<br />
15 Note to Schedule <strong>of</strong><br />
Rates:<br />
16 Policy <strong>for</strong> Tenders Under<br />
Consideration:<br />
14.1 The field management will be the responsibility <strong>of</strong> the<br />
ENGINEER-IN-CHARGE, who will be nominated by the EMPLOYER.<br />
The ENGINEER-IN-CHARGE may also authorise his representatives<br />
to assist in per<strong>for</strong>ming his duties and functions.<br />
14.2 The ENGINEER-IN-CHARGE shall coordinate the works <strong>of</strong> various<br />
agencies engaged at site to ensure minimum disruption <strong>of</strong> work carried<br />
out by different agencies. It shall be the responsibility <strong>of</strong> the<br />
CONTRACTOR to plan and execute the work strictly in accordance<br />
with site instructions to avoid hindrance to the work being executed by<br />
other agencies.<br />
15.1 The Schedule <strong>of</strong> Rates should be read in conjunction with all the other<br />
sections <strong>of</strong> the tender.<br />
15.2 The tenderer shall be deemed to have studied the DRAWINGS,<br />
SPECIFICATIONS and details <strong>of</strong> work to be done within TIME<br />
SCHEDULE and to have aquainted himself <strong>of</strong> the condition prevailing<br />
at site.<br />
15.3 Rates must be filled in the Schedule <strong>of</strong> Rates <strong>of</strong> original Tender<br />
Documents. If quoted in separate typed sheets no variation in item<br />
description or specification shall be accepted. Any exceptions taken by<br />
the tenderer to the Schedule <strong>of</strong> Rates shall be brought out in the terms<br />
and conditions <strong>of</strong> the <strong>of</strong>fer.<br />
15.4 The quantities shown against the various items are only approximate.<br />
Any increase or decrease in the quantities shall not <strong>for</strong>m the basis <strong>of</strong><br />
alteration <strong>of</strong> the rates quoted and accepted.<br />
15.5 The EMPLOYER reserves the right to interpolate the rates <strong>for</strong> such<br />
items <strong>of</strong> work falling between similar items <strong>of</strong> lower and higher<br />
magnitude.<br />
16.1 Only Those Tenders which are complete in all respects and are strictly<br />
in accordance with the Terms and Conditions and Technical<br />
Specifications <strong>of</strong> Tender Document, shall be considered <strong>for</strong> evaluation.<br />
Such Tenders shall be deemed to be under consideration immediately<br />
after opening <strong>of</strong> Tender and until such time an <strong>of</strong>ficial intimation <strong>of</strong><br />
acceptance /rejection <strong>of</strong> Tender is made by <strong>GAIL</strong> to the Bidder.<br />
16.2 Zero Deviation: Bidders to note that this is a ZERO DEVIATION<br />
TENDER. <strong>GAIL</strong> will appreciate submission <strong>of</strong> <strong>of</strong>fer based on the<br />
terms and conditions in the enclosed General Conditions <strong>of</strong> Contract<br />
(GCC), Special Conditions <strong>of</strong> Contract (SCC), Instructions to<br />
Bidders (ITB), Scope <strong>of</strong> Work, technical specifications etc. to avoid<br />
wastage <strong>of</strong> time and money in seeking clarifications on technical/<br />
commercial aspects <strong>of</strong> the <strong>of</strong>fer. Bidder may note that no technical<br />
and commercial clarifications will be sought <strong>for</strong> after the receipt <strong>of</strong><br />
the bids. In case <strong>of</strong> any deviation/noncon<strong>for</strong>mity observed in the bid,<br />
Page 67 <strong>of</strong> 158