H Pressure gauges in the gauge board <strong>of</strong> the Packaged chiller/condensing unit shall be<br />
checked <strong>for</strong> their correctness and recalibrated or replaced, if necessary.<br />
I The Air Handling Unit/Fan Coil Unit filers shall be inspected and cleaned once in<br />
every month or more if necessary.<br />
J Cleaning <strong>of</strong> the cooling tower shall be carried out by the Contractor at least twice<br />
in a season or as required based on actual site condition.<br />
K Seasonal pump down and restart <strong>of</strong> the AC System.<br />
L The HVAC Compressors shall be serviced atleast once in a year during the <strong>contract</strong><br />
period. The service shall be rendered positively be<strong>for</strong>e the onset <strong>of</strong> the summer to<br />
ensure the trouble free working <strong>of</strong> the Plant during summer. Break down calls shall<br />
be attended to during the <strong>contract</strong> period and is independent <strong>of</strong> the scheduled pump<br />
down <strong>maintenance</strong>. The plant shall be switched from winter to summer cycle <strong>of</strong><br />
operation state on every onset <strong>of</strong> the summer and vice versa in case <strong>of</strong> winter<br />
season. During the <strong>annual</strong> servicing <strong>of</strong> the Compressors, the engine is required to be<br />
opened up and properly inspected. ALL THE GASKET SET, O-RING SET, SAFETY<br />
PLATES, GUDEON PINS. ETC (OF ORIGINAL KIRLASKAR/VOLTAS MAKE)<br />
SHALL BE REPLACED WITH NEW ONES WHENEVER THE COMPRESSOR IS<br />
OPENED UP FOR INSPECTION/ADJUSTMENT AND CLEANING, NO PAYMENT<br />
SHALL BE MADE FOR THESE MATERIALS. THE CONTRACTOR SHOULD LOAD<br />
THIS EXPENDITURE WHILE QUOTING FOR THE CONTRACT. ALL THE ABOVE<br />
MAERIALS SHALL BE BROUGHT TO SITE ON COMPANY SEALED PACKETS AND<br />
CERTIFIED BY EIC.<br />
2.15.3 RECIPROCATING COMPRESSOR<br />
- To check and change compressor oil, filter element etc.<br />
- Check condition and alignment <strong>of</strong> compressor coupling and leakage in the shaft seal.<br />
- Check operation <strong>of</strong> all controls and interlocking <strong>of</strong> various equipments.<br />
2.15.4 COMPRESSOR MOTOR<br />