04.08.2013 Views

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

48.0 Certificate not to affect Right <strong>of</strong> Employer and Liability <strong>of</strong> Contractor<br />

49.0 Languages & Measures<br />

50.0 Transfer <strong>of</strong> Title<br />

51.0 Release <strong>of</strong> In<strong>for</strong>mation<br />

52.0 Brand Names<br />

53.0 Completion <strong>of</strong> Contract<br />

54.0 Spares<br />

SECTION-V (PERFORMANCE OF WORK)<br />

55.0 Execution <strong>of</strong> Work<br />

56.0 Co-ordination and Inspection <strong>of</strong> work<br />

57.0 Work in Monsoon & Dewatering<br />

58.0 Work on Sundays & Holidays<br />

59.0 General Conditions <strong>for</strong> construction &<br />

Erection Work<br />

60.0 Alterations in specification, Design &<br />

Extra Work<br />

61.0 Drawings to be supplied by the Employer<br />

62.0 Drawings to be supplied by the Contractor<br />

63.0 Setting out works<br />

64.0 Responsibility <strong>for</strong> Levels and Alignment<br />

65.0 Materials to be supplied by <strong>contract</strong>or<br />

66.0 Stores supplied by Employer<br />

67.0 Conditions <strong>for</strong> issue <strong>of</strong> material<br />

68.0 Materials Procured with assistance <strong>of</strong><br />

Employer/Return <strong>of</strong> surplus<br />

69.0 Materials obtained from dismantling<br />

70.0 Articles <strong>of</strong> Value found<br />

71.0 Discrepancies between instructions<br />

72.0 Action where no specification is issued<br />

73.0 Inspection <strong>of</strong> Works<br />

74.0 Tests <strong>for</strong> Quality <strong>of</strong> Works<br />

75.0 Samples <strong>for</strong> approval<br />

76.0 Action and Compensation in case <strong>of</strong> bad work<br />

77.0 Suspension <strong>of</strong> Work<br />

78.0 Employer may do part <strong>of</strong> work<br />

79.0 Possession prior to completion<br />

80.0 Twelve months period <strong>of</strong> liability from the<br />

date <strong>of</strong> issue <strong>of</strong> completion certificate<br />

80.3 Limitation <strong>of</strong> Liability<br />

81.0 Care <strong>of</strong> Works<br />

81.1 Defects prior to taking over<br />

81.2 Defects after taking over<br />

82.0 Guarantee/Transfer <strong>of</strong> Guarantee<br />

83.0 Training <strong>of</strong> Employer's personnel<br />

84.0 Replacement <strong>of</strong> Defective parts & materials<br />

85.0 Indemnity<br />

86.0 Construction Aids, Equipments, Tools & Tackles<br />

SECTION-VI (CERTIFICATES AND PAYMENTS)<br />

87.0 Schedule <strong>of</strong> Rates and Payments<br />

i) Contractor's Remuneration<br />

ii) Schedule <strong>of</strong> Rates to be inclusive<br />

Page 53 <strong>of</strong> 158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!