Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
48.0 Certificate not to affect Right <strong>of</strong> Employer and Liability <strong>of</strong> Contractor<br />
49.0 Languages & Measures<br />
50.0 Transfer <strong>of</strong> Title<br />
51.0 Release <strong>of</strong> In<strong>for</strong>mation<br />
52.0 Brand Names<br />
53.0 Completion <strong>of</strong> Contract<br />
54.0 Spares<br />
SECTION-V (PERFORMANCE OF WORK)<br />
55.0 Execution <strong>of</strong> Work<br />
56.0 Co-ordination and Inspection <strong>of</strong> work<br />
57.0 Work in Monsoon & Dewatering<br />
58.0 Work on Sundays & Holidays<br />
59.0 General Conditions <strong>for</strong> construction &<br />
Erection Work<br />
60.0 Alterations in specification, Design &<br />
Extra Work<br />
61.0 Drawings to be supplied by the Employer<br />
62.0 Drawings to be supplied by the Contractor<br />
63.0 Setting out works<br />
64.0 Responsibility <strong>for</strong> Levels and Alignment<br />
65.0 Materials to be supplied by <strong>contract</strong>or<br />
66.0 Stores supplied by Employer<br />
67.0 Conditions <strong>for</strong> issue <strong>of</strong> material<br />
68.0 Materials Procured with assistance <strong>of</strong><br />
Employer/Return <strong>of</strong> surplus<br />
69.0 Materials obtained from dismantling<br />
70.0 Articles <strong>of</strong> Value found<br />
71.0 Discrepancies between instructions<br />
72.0 Action where no specification is issued<br />
73.0 Inspection <strong>of</strong> Works<br />
74.0 Tests <strong>for</strong> Quality <strong>of</strong> Works<br />
75.0 Samples <strong>for</strong> approval<br />
76.0 Action and Compensation in case <strong>of</strong> bad work<br />
77.0 Suspension <strong>of</strong> Work<br />
78.0 Employer may do part <strong>of</strong> work<br />
79.0 Possession prior to completion<br />
80.0 Twelve months period <strong>of</strong> liability from the<br />
date <strong>of</strong> issue <strong>of</strong> completion certificate<br />
80.3 Limitation <strong>of</strong> Liability<br />
81.0 Care <strong>of</strong> Works<br />
81.1 Defects prior to taking over<br />
81.2 Defects after taking over<br />
82.0 Guarantee/Transfer <strong>of</strong> Guarantee<br />
83.0 Training <strong>of</strong> Employer's personnel<br />
84.0 Replacement <strong>of</strong> Defective parts & materials<br />
85.0 Indemnity<br />
86.0 Construction Aids, Equipments, Tools & Tackles<br />
SECTION-VI (CERTIFICATES AND PAYMENTS)<br />
87.0 Schedule <strong>of</strong> Rates and Payments<br />
i) Contractor's Remuneration<br />
ii) Schedule <strong>of</strong> Rates to be inclusive<br />
Page 53 <strong>of</strong> 158