5.<br />
6.<br />
Consortium<br />
One Bid per<br />
Bidder<br />
Cost <strong>of</strong> Bidding<br />
requirement <strong>of</strong> the work subject to following :<br />
(a) the partner in charge/ the leader <strong>of</strong> the Joint Venture/ Consortium<br />
respectively should satisfy the requirement as per Bid Evaluation<br />
Criteria mentioned at Clause No. 3 above;<br />
(b) the partner in charge /the leader <strong>of</strong> the Joint Venture / Consortium<br />
respectively should confirm unconditional acceptance <strong>of</strong> full<br />
responsibility <strong>of</strong> executing the ‘Scope <strong>of</strong> work’ <strong>of</strong> this tender. This<br />
confirmation should be submitted along with the technocommercial<br />
bid;<br />
(c) the bid security, the bid, and in case <strong>of</strong> a successful bid, the<br />
Agreement, shall be signed so as to be legally binding on all<br />
partners <strong>of</strong> Joint Venture / members <strong>of</strong> Consortium;<br />
(d) one <strong>of</strong> the partners / members shall be nominated as being in charge<br />
/ leader <strong>of</strong> the Joint Venture / Consortium respectively and this<br />
authorization shall be evidenced by submitting a power <strong>of</strong> attorney<br />
signed by legally authorized signatories <strong>of</strong> all the<br />
partners/members;<br />
(e) the partner in charge / leader shall be authorized to incur liabilities<br />
and receive instructions <strong>for</strong> and on behalf <strong>of</strong> any and all partners <strong>of</strong><br />
the Joint Venture/members <strong>of</strong> the Consortium and the entire<br />
execution <strong>of</strong> the Contract, including payment, shall be done<br />
exclusively with the partner in charge/leader <strong>of</strong> Consortium;<br />
(f) all partners <strong>of</strong> the Joint Venture / members <strong>of</strong> Consortium shall be<br />
liable jointly and severally <strong>for</strong> the execution <strong>of</strong> the Contract in<br />
accordance with the <strong>contract</strong> terms, and a statement to this effect<br />
shall be included in the authorization mentioned under (d) above, as<br />
well as in the bid and in the Agreement (in case <strong>of</strong> a successful<br />
bid); and<br />
(g) a copy <strong>of</strong> the Joint Venture / Consortium Agreement entered into<br />
by all partners / members shall be submitted with the bid.<br />
Alternatively, a Letter <strong>of</strong> Intent to execute a Joint Venture /<br />
Consortium Agreement in the event <strong>of</strong> a successful bid shall be<br />
signed by all partners/members and submitted with the bid, together<br />
with a copy <strong>of</strong> the proposed agreement.<br />
5.1 A firm shall submit only one bid in the same bidding process, either<br />
individually as a bidder or as a partner in a joint venture or as a<br />
member <strong>of</strong> consortium. No firm can be a sub<strong>contract</strong>or while<br />
submitting a bid individually or as a partner <strong>of</strong> a joint venture or as<br />
a member <strong>of</strong> a consortium in the same bidding process. A firm, if<br />
acting in the capacity <strong>of</strong> sub<strong>contract</strong>or in any bid, may participate<br />
in more than one bid, but only in that capacity. A bidder who<br />
submits or participates in more than one bid will cause all the<br />
proposals in which the bidder has participated to be disqualified.<br />
6.1 The bidder shall bear all costs associated with the preparation and<br />
submission <strong>of</strong> the bid, and <strong>GAIL</strong> will in no case, be responsible or<br />
liable <strong>for</strong> these costs, regardless <strong>of</strong> the conduct or outcome <strong>of</strong> the<br />
bidding process.<br />
7. Site Visit 7.1 The bidder is advised to visit and examine the Site <strong>of</strong> Works and its<br />
surroundings and obtain <strong>for</strong> itself on its own responsibility all<br />
in<strong>for</strong>mation that may be necessary <strong>for</strong> preparing the bid and entering<br />
into a <strong>contract</strong> <strong>for</strong> construction <strong>of</strong> the Works. The costs <strong>of</strong> visiting<br />
Page 17 <strong>of</strong> 158