5.<br />

6.<br />

Consortium<br />

One Bid per<br />

Bidder<br />

Cost <strong>of</strong> Bidding<br />

requirement <strong>of</strong> the work subject to following :<br />

(a) the partner in charge/ the leader <strong>of</strong> the Joint Venture/ Consortium<br />

respectively should satisfy the requirement as per Bid Evaluation<br />

Criteria mentioned at Clause No. 3 above;<br />

(b) the partner in charge /the leader <strong>of</strong> the Joint Venture / Consortium<br />

respectively should confirm unconditional acceptance <strong>of</strong> full<br />

responsibility <strong>of</strong> executing the ‘Scope <strong>of</strong> work’ <strong>of</strong> this tender. This<br />

confirmation should be submitted along with the technocommercial<br />

bid;<br />

(c) the bid security, the bid, and in case <strong>of</strong> a successful bid, the<br />

Agreement, shall be signed so as to be legally binding on all<br />

partners <strong>of</strong> Joint Venture / members <strong>of</strong> Consortium;<br />

(d) one <strong>of</strong> the partners / members shall be nominated as being in charge<br />

/ leader <strong>of</strong> the Joint Venture / Consortium respectively and this<br />

authorization shall be evidenced by submitting a power <strong>of</strong> attorney<br />

signed by legally authorized signatories <strong>of</strong> all the<br />

partners/members;<br />

(e) the partner in charge / leader shall be authorized to incur liabilities<br />

and receive instructions <strong>for</strong> and on behalf <strong>of</strong> any and all partners <strong>of</strong><br />

the Joint Venture/members <strong>of</strong> the Consortium and the entire<br />

execution <strong>of</strong> the Contract, including payment, shall be done<br />

exclusively with the partner in charge/leader <strong>of</strong> Consortium;<br />

(f) all partners <strong>of</strong> the Joint Venture / members <strong>of</strong> Consortium shall be<br />

liable jointly and severally <strong>for</strong> the execution <strong>of</strong> the Contract in<br />

accordance with the <strong>contract</strong> terms, and a statement to this effect<br />

shall be included in the authorization mentioned under (d) above, as<br />

well as in the bid and in the Agreement (in case <strong>of</strong> a successful<br />

bid); and<br />

(g) a copy <strong>of</strong> the Joint Venture / Consortium Agreement entered into<br />

by all partners / members shall be submitted with the bid.<br />

Alternatively, a Letter <strong>of</strong> Intent to execute a Joint Venture /<br />

Consortium Agreement in the event <strong>of</strong> a successful bid shall be<br />

signed by all partners/members and submitted with the bid, together<br />

with a copy <strong>of</strong> the proposed agreement.<br />

5.1 A firm shall submit only one bid in the same bidding process, either<br />

individually as a bidder or as a partner in a joint venture or as a<br />

member <strong>of</strong> consortium. No firm can be a sub<strong>contract</strong>or while<br />

submitting a bid individually or as a partner <strong>of</strong> a joint venture or as<br />

a member <strong>of</strong> a consortium in the same bidding process. A firm, if<br />

acting in the capacity <strong>of</strong> sub<strong>contract</strong>or in any bid, may participate<br />

in more than one bid, but only in that capacity. A bidder who<br />

submits or participates in more than one bid will cause all the<br />

proposals in which the bidder has participated to be disqualified.<br />

6.1 The bidder shall bear all costs associated with the preparation and<br />

submission <strong>of</strong> the bid, and <strong>GAIL</strong> will in no case, be responsible or<br />

liable <strong>for</strong> these costs, regardless <strong>of</strong> the conduct or outcome <strong>of</strong> the<br />

bidding process.<br />

7. Site Visit 7.1 The bidder is advised to visit and examine the Site <strong>of</strong> Works and its<br />

surroundings and obtain <strong>for</strong> itself on its own responsibility all<br />

in<strong>for</strong>mation that may be necessary <strong>for</strong> preparing the bid and entering<br />

into a <strong>contract</strong> <strong>for</strong> construction <strong>of</strong> the Works. The costs <strong>of</strong> visiting<br />

Page 17 <strong>of</strong> 158