- Page 1 and 2: GAIL(INDIA) LIMITED, 16, BHIKAI JI
- Page 3 and 4: INTRODUCTION Page 3 of 158
- Page 5 and 6: GAIL (India) Limited (A Govt. of In
- Page 7 and 8: 8.0 This Invitation for Bids (IFB)
- Page 9 and 10: Page 9 of 158 Annexure-1 Bid Evalua
- Page 11 and 12: Evaluation Methodology : EVALUATION
- Page 13 and 14: PRICE BID DO NOT OPEN - THIS IS A Q
- Page 15 and 16: B. Bidding Documents 8. Content of
- Page 17 and 18: 5. 6. Consortium One Bid per Bidder
- Page 19 and 20: 10. Amendment of Bidding Documents
- Page 21 and 22: 13.3 Bidder shall quote for all the
- Page 23 and 24: 16.4 Any bid not secured in accorda
- Page 25 and 26: (enclosing copy of the same). The b
- Page 27 and 28: 25.2 The modification shall also be
- Page 29 and 30: ICB tenders only] 32. Evaluation an
- Page 31 and 32: 40. Contract Performance Security 4
- Page 33 and 34: FORMS AND FORMATS Page 33 of 158
- Page 35: F-2 BID FORM To GAIL(INDIA) LIMITED
- Page 39 and 40: PROFORMA FOR BANK GUARANTEE FOR EAR
- Page 41 and 42: To, (Beneficiary) F-4A FORMAT FOR L
- Page 43 and 44: F-6 NO DEVIATION CONFIRMATION GAIL(
- Page 45 and 46: Descriptio n of the work Locati on
- Page 47 and 48: F-10 PROFORMA OF BANK GUARANTEE FOR
- Page 49 and 50: INSTRUCTIONS FOR FURNISHING CONTRAC
- Page 51 and 52: Sl.No. Description (i) TABLE OF CON
- Page 53 and 54: 48.0 Certificate not to affect Righ
- Page 55 and 56: SECTION-X (SAFETY CODES) 109.0 Gene
- Page 57 and 58: 1.1.10 The "CONTRACT” shall mean
- Page 59 and 60: 1.1.32 "COMMISSIONING" shall mean p
- Page 61 and 62: 2.4.6 The power supply required for
- Page 63 and 64: in and signed by the tenderer as pr
- Page 65 and 66: 6. Earnest Money: 6.1 The bidder mu
- Page 67 and 68: 13 Signing of the Contract: 13.1 Th
- Page 69 and 70: 22 Special Conditions of Contract:
- Page 71 and 72: 24 Contract Performance Security: N
- Page 73 and 74: 27 Price reduction schedule: party
- Page 75 and 76: CONTRACTOR and complete the same th
- Page 77 and 78: 32 Termination of contract 33 Membe
- Page 79 and 80: event of such employee so trespassi
- Page 81 and 82: 39 Contractor's responsibility with
- Page 83 and 84: interests involved shall be determi
- Page 85 and 86: 46 Payment if the contract is termi
- Page 87 and 88:
Also the CONTRACTOR should furnish
- Page 89 and 90:
in the manner above specified as pa
- Page 91 and 92:
61 Drawings to be supplied by the e
- Page 93 and 94:
66 Stores supplied by the employer:
- Page 95 and 96:
68 Material procured with assistanc
- Page 97 and 98:
efore obtaining the approval in wri
- Page 99 and 100:
80 (Defects liability period) twelv
- Page 101 and 102:
82 Guarantee/transfer of guarantee:
- Page 103 and 104:
deemed to include and cover all cos
- Page 105 and 106:
88.1.3 ENGINEER-IN-CHARGE shall pas
- Page 107 and 108:
92 Payment of contractor's bill: 92
- Page 109 and 110:
97 Deductions from the contract pri
- Page 111 and 112:
the CONTRACTOR in writing to limit
- Page 113 and 114:
102 Damage to Property or to any Pe
- Page 115 and 116:
true statement showing in respect o
- Page 117 and 118:
106 Health and sanitary arrangement
- Page 119 and 120:
111 First aid and industrial injuri
- Page 121 and 122:
within 1.5 metres of the edge of th
- Page 123 and 124:
117 Care in handling inflammable ga
- Page 125 and 126:
123 Outbreak of infectious diseases
- Page 127 and 128:
date that the same or relative part
- Page 129 and 130:
PROFORMA FOR CONTRACT AGREEMENT LOA
- Page 131 and 132:
EMPLOYER will pay to the CONTRACTOR
- Page 133 and 134:
SECTION IV. SPECIAL CONDITIONS OF C
- Page 135 and 136:
Contractor is expected to maintain
- Page 137 and 138:
1.14 All the materials to be used/r
- Page 139 and 140:
3.0 GAIL is at its liberty to add o
- Page 141 and 142:
Contractor. This point is independe
- Page 143 and 144:
(ii) Tie-up with LG for supplying o
- Page 145 and 146:
B : Supplying of materials and othe
- Page 147 and 148:
1. SUPERVISOR : 12 Man-hour/day 2.
- Page 149 and 150:
H Pressure gauges in the gauge boar
- Page 151 and 152:
provided the necessity of replacing
- Page 153 and 154:
PART - II A. GAIL Infohub : 1. Cass
- Page 155 and 156:
155
- Page 157 and 158:
157