63<br />
64<br />
Setting out works:<br />
Responsibility <strong>for</strong> level and<br />
alignment:<br />
65 Materials to be supplied by<br />
<strong>contract</strong>or:<br />
62.4 As built drawings showing all corrections, adjustments etc. shall be<br />
furnished by the CONTRACTOR in six copies and one transparent<br />
<strong>for</strong> record purposed to the EMPLOYER.<br />
63.1 The ENGINEER-IN-CHARGE shall furnish the CONTRACTOR with<br />
only the four corners <strong>of</strong> the Works site and a level bench mark and<br />
the CONTRACTOR shall set out the Works and shall provide an<br />
efficient staff <strong>for</strong> the purpose and shall be solely responsible <strong>for</strong> the<br />
accuracy <strong>of</strong> such setting out.<br />
63.2 The CONTRACTOR shall provide, fix and be responsible <strong>for</strong> the<br />
<strong>maintenance</strong> <strong>of</strong> all stakes, templates, level marks, pr<strong>of</strong>iles and other<br />
similar things and shall take all necessary precautions to prevent<br />
their removal or disturbance and shall be responsible <strong>for</strong> the<br />
consequence <strong>of</strong> such removal or disturbance should the same take<br />
place and <strong>for</strong> their efficient and timely reinstatement. The<br />
CONTRACTOR shall also be responsible <strong>for</strong> the <strong>maintenance</strong> <strong>of</strong> all<br />
existing survey marks, boundary marks, distance marks and center<br />
line marks, either existing or supplied and fixed by the<br />
CONTRACTOR. The work shall be set out to the satisfaction <strong>of</strong> the<br />
ENGINEER-IN-CHARGE. The approval there <strong>of</strong> joining with the<br />
CONTRACTOR by the ENGINEER- IN-CHARGE in setting out the<br />
work, shall not relieve the CONTRACTOR <strong>of</strong> any <strong>of</strong> his<br />
responsibility.<br />
63.3 Be<strong>for</strong>e beginning the Works, the CONTRACTOR shall at his own<br />
cost, provide all necessary reference and level posts, pegs,<br />
bamboos, flags, ranging rods, strings and other materials <strong>for</strong> proper<br />
layout <strong>of</strong> the works in accordance with the schemes <strong>for</strong> bearing<br />
marks acceptable to the ENGINEER-IN-CHARGE. The center,<br />
longitudinal or face lines and cross lines shall be marked by means<br />
<strong>of</strong> small masonry pillars. Each pillar shall have distinct mark at the<br />
centre to enable theodolite to be set over it. No work shall be<br />
started until all these points are checked and approved by the<br />
ENGINEER-IN-CHARGE in writing but such approval shall not<br />
relieve the CONTRACTOR <strong>of</strong> any <strong>of</strong> his responsibilities. The<br />
CONTRACTOR shall also provide all labour, material and other<br />
facilities, as necessary, <strong>for</strong> the proper checking <strong>of</strong> layout and<br />
inspection <strong>of</strong> the points during construction.<br />
63.4 Pillars bearing geodetic marks located at the sites <strong>of</strong> units <strong>of</strong><br />
WORKS under construction should be protected and fenced by the<br />
CONTRACTOR.<br />
63.5 On completion <strong>of</strong> WORK, the CONTRACTOR must submit the<br />
geodetic documents according to which the WORK was carried out.<br />
64.1 The CONTRACTOR shall be entirely and exclusively responsible<br />
<strong>for</strong> the horizontal and vertical alignment, the levels and correctness<br />
<strong>of</strong> every part <strong>of</strong> the WORK and shall rectify effectively any errors or<br />
imperfections therein, such rectifications shall be carried out by the<br />
CONTRACTOR, at his own cost, when instructions are issued to<br />
that effect by the ENGINEER- IN-CHARGE.<br />
65.1 The CONTRACTOR shall procure and provide within the VALUE<br />
OF CONTRACT the whole <strong>of</strong> the materials required <strong>for</strong> the<br />
construction including steels, cement and other building materials,<br />
Page 92 <strong>of</strong> 158