Setting out works:<br />

Responsibility <strong>for</strong> level and<br />

alignment:<br />

65 Materials to be supplied by<br />

<strong>contract</strong>or:<br />

62.4 As built drawings showing all corrections, adjustments etc. shall be<br />

furnished by the CONTRACTOR in six copies and one transparent<br />

<strong>for</strong> record purposed to the EMPLOYER.<br />

63.1 The ENGINEER-IN-CHARGE shall furnish the CONTRACTOR with<br />

only the four corners <strong>of</strong> the Works site and a level bench mark and<br />

the CONTRACTOR shall set out the Works and shall provide an<br />

efficient staff <strong>for</strong> the purpose and shall be solely responsible <strong>for</strong> the<br />

accuracy <strong>of</strong> such setting out.<br />

63.2 The CONTRACTOR shall provide, fix and be responsible <strong>for</strong> the<br />

<strong>maintenance</strong> <strong>of</strong> all stakes, templates, level marks, pr<strong>of</strong>iles and other<br />

similar things and shall take all necessary precautions to prevent<br />

their removal or disturbance and shall be responsible <strong>for</strong> the<br />

consequence <strong>of</strong> such removal or disturbance should the same take<br />

place and <strong>for</strong> their efficient and timely reinstatement. The<br />

CONTRACTOR shall also be responsible <strong>for</strong> the <strong>maintenance</strong> <strong>of</strong> all<br />

existing survey marks, boundary marks, distance marks and center<br />

line marks, either existing or supplied and fixed by the<br />

CONTRACTOR. The work shall be set out to the satisfaction <strong>of</strong> the<br />

ENGINEER-IN-CHARGE. The approval there <strong>of</strong> joining with the<br />

CONTRACTOR by the ENGINEER- IN-CHARGE in setting out the<br />

work, shall not relieve the CONTRACTOR <strong>of</strong> any <strong>of</strong> his<br />

responsibility.<br />

63.3 Be<strong>for</strong>e beginning the Works, the CONTRACTOR shall at his own<br />

cost, provide all necessary reference and level posts, pegs,<br />

bamboos, flags, ranging rods, strings and other materials <strong>for</strong> proper<br />

layout <strong>of</strong> the works in accordance with the schemes <strong>for</strong> bearing<br />

marks acceptable to the ENGINEER-IN-CHARGE. The center,<br />

longitudinal or face lines and cross lines shall be marked by means<br />

<strong>of</strong> small masonry pillars. Each pillar shall have distinct mark at the<br />

centre to enable theodolite to be set over it. No work shall be<br />

started until all these points are checked and approved by the<br />

ENGINEER-IN-CHARGE in writing but such approval shall not<br />

relieve the CONTRACTOR <strong>of</strong> any <strong>of</strong> his responsibilities. The<br />

CONTRACTOR shall also provide all labour, material and other<br />

facilities, as necessary, <strong>for</strong> the proper checking <strong>of</strong> layout and<br />

inspection <strong>of</strong> the points during construction.<br />

63.4 Pillars bearing geodetic marks located at the sites <strong>of</strong> units <strong>of</strong><br />

WORKS under construction should be protected and fenced by the<br />

CONTRACTOR.<br />

63.5 On completion <strong>of</strong> WORK, the CONTRACTOR must submit the<br />

geodetic documents according to which the WORK was carried out.<br />

64.1 The CONTRACTOR shall be entirely and exclusively responsible<br />

<strong>for</strong> the horizontal and vertical alignment, the levels and correctness<br />

<strong>of</strong> every part <strong>of</strong> the WORK and shall rectify effectively any errors or<br />

imperfections therein, such rectifications shall be carried out by the<br />

CONTRACTOR, at his own cost, when instructions are issued to<br />

that effect by the ENGINEER- IN-CHARGE.<br />

65.1 The CONTRACTOR shall procure and provide within the VALUE<br />

OF CONTRACT the whole <strong>of</strong> the materials required <strong>for</strong> the<br />

construction including steels, cement and other building materials,<br />

Page 92 <strong>of</strong> 158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!