SPECIAL CONDITIONS OF CONTRACT<br />
1.0 SPECIAL CONDITIONS OF CONTRACT<br />
For HVAC Plant :<br />
1.1 In case <strong>of</strong> a breakdown in the AC system, the Contractor should immediately take up<br />
the rectification work and re-arrange/replace the damaged items so as to make the<br />
system ready within the shortest possible time and not exceeding a maximum period<br />
<strong>of</strong> 8 hours, where no major spares is required. Any breakdown/servicing on the<br />
compressors shall be done with the supervision <strong>of</strong> the authorized service agency <strong>of</strong><br />
the compressors. Necessary reports to be submitted <strong>for</strong> this.<br />
Any problems in the Ductable ACs shall be attended without any time delay<br />
whenever the complaint is lodged. For the purpose the HVAC plant is to be<br />
manned 24 hours (night hours during Sundays/holidays). Arrangement to be<br />
made <strong>for</strong> attending breakdowns at the earliest and all machines to be in healthy<br />
condition with minimum down time to the extent possible.<br />
1.2 All <strong>maintenance</strong> check sheets to be submitted <strong>for</strong> approval <strong>of</strong> Gail be<strong>for</strong>ehand.<br />
Check sheets and tests required/specified are in general, certain modification may<br />
be necessary <strong>for</strong> efficient functioning <strong>of</strong> equipments as per the recommendations <strong>of</strong><br />
the equipment manufacturer.<br />
1.3 The <strong>contract</strong> shall be valid <strong>for</strong> a period <strong>of</strong> two years from the date <strong>of</strong> award <strong>of</strong><br />
work, i.e. 24 months and may be extended further on mutual discussion and<br />
agreement. Gail reserves the right to terminate the <strong>contract</strong> without assigning any<br />
reason during the currency <strong>of</strong> the <strong>contract</strong> period by giving 30 days notice to the<br />
Contractor.<br />
1.4 The Contractor has to make arrangement <strong>for</strong> the safety <strong>of</strong> the equipments. Owner<br />
shall not be responsible <strong>for</strong> any misplacement or damage or theft <strong>of</strong> the<br />
Contractor's equipment or any other articles.<br />
1.5 Contractor has to abide by the security arrangements/regulations <strong>of</strong> the building in<br />
<strong>for</strong>ce or any other regulations en<strong>for</strong>ced from time to time. The Contractor has to<br />
provide proper uni<strong>for</strong>ms and shoes to all its personnel. ALL CONTRACT<br />
PERSONNEL SHALL ATTEND DUTY WITH FULL UNIFORM (cotton) DURING<br />
THE WHOLE DURATION OF THE CONTRACT PERIOD. ANY CONTRACT<br />
PERSONNEL WITHOUT PROPER UNIFORM MAY BE REFUSED ENTRY INSIDE<br />
THE PREMISES AND SHALL BE CONSIDERED ABSENT FROM DUTY. The<br />