Page 90 <strong>of</strong> 158<br />
e) Provisions contained in the Sub-clause (a) & (d)<br />
above shall, however, not apply <strong>for</strong> the<br />
following:-<br />
Where the value <strong>of</strong> additions <strong>of</strong> new items<br />
together with the value <strong>of</strong> alterations,<br />
additions/deletions or substitutions does not<br />
exceed by or is not less than plus/minus ()25%<br />
<strong>of</strong> the VALUE OF CONTRACT. The item rates in<br />
the Schedule <strong>of</strong> Rates shall hold good <strong>for</strong> all<br />
such variations between the above mentioned<br />
limits, irrespective <strong>of</strong> any increase/decrease <strong>of</strong><br />
quantities in the individual items <strong>of</strong> Schedule <strong>of</strong><br />
Rates.<br />
Where the value <strong>of</strong> addition <strong>of</strong> new items<br />
together with the value <strong>of</strong> alterations,<br />
additions/deletions or substitutions reduces more<br />
than 25% <strong>of</strong> the <strong>contract</strong> value but is within the<br />
following limits the tenderer shall be paid<br />
compensation <strong>for</strong> decrease in the value <strong>of</strong> work,<br />
as follows:<br />
S.No. Range <strong>of</strong> Variation Percentage compensation <strong>for</strong><br />
decrease in the value <strong>of</strong> work<br />
in the respective range.<br />
a) Beyond (+) 25% upto & No increase and/or decrease<br />
inclusive <strong>of</strong> (+) 50% shall be applicable <strong>for</strong> the<br />
Schedule <strong>of</strong> Rates (The rates<br />
quoted <strong>for</strong> this increase shall<br />
be valid).<br />
b) Beyond (-) 25% upto & For reduction beyond 25%<br />
inclusive <strong>of</strong> (-) 50% <strong>contract</strong>or shall be<br />
compensated by an amount<br />
equivalent to 10% <strong>of</strong> the<br />
reduction in value <strong>of</strong> the<br />
<strong>contract</strong> as awarded. For<br />
example if the actual <strong>contract</strong><br />
value is 70% <strong>of</strong> awarded value<br />
then compensation shall be<br />
10% <strong>of</strong> (75-70) i.e. 0.5% <strong>of</strong><br />
awarded <strong>contract</strong> value.<br />
II. For Lumpsum Contracts<br />
CONTRACTOR shall, within 7 days <strong>of</strong> the date <strong>of</strong> receipt<br />
<strong>of</strong> order to carry out the WORK, in<strong>for</strong>m the<br />
ENGINEER-IN- CHARGE <strong>of</strong> the rates which it is his<br />
intention to charge <strong>for</strong> such class <strong>of</strong> WORK, supported by<br />
analysis <strong>of</strong> the rate or rates claimed, and the<br />
ENGINEER-IN-CHARGE shall determine the rate or<br />
rates on the basis <strong>of</strong> the prevailing market rates, labour<br />
cost at schedule <strong>of</strong> labour rates plus 10% to cover<br />
<strong>contract</strong>or's supervision, overheads and pr<strong>of</strong>it and pay<br />
the CONTRACTOR accordingly. The opinion <strong>of</strong> the<br />
ENGINEER- IN-CHARGE as to current market rates <strong>of</strong><br />
materials and the quantum <strong>of</strong> labour involved per unit <strong>of</strong>