04.08.2013 Views

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

Procurement of amc(annual maintenance contract) for hvac ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

functioning and get it signed from the Engineer-in-Charge in each week during the<br />

currency <strong>of</strong> the <strong>contract</strong>.<br />

1.22 All the installed equipments shall be regularly checked <strong>for</strong> any abnormal<br />

sound/vibration will be immediately attended.<br />

1.23 Replacement <strong>of</strong> wiring inside and outside <strong>of</strong> the equipments shall be in the scope <strong>of</strong><br />

the Contractor.<br />

1.0 For the 8.5TR/11 TR ductable ACs, local cut open/welded and repaired<br />

compressors will not be accepted. The work <strong>of</strong> replacement <strong>of</strong> the compressor<br />

should be got done from the original manufacturer or its authorized dealers<br />

only.<br />

2.0 All the overhauling, painting and repair jobs carried out on the AC should be <strong>of</strong> good<br />

quality and up to the entire satisfaction <strong>of</strong> the Engineer-In-Charge.<br />

1.26 The Contractor shall nominate a person who shall supervise and co-ordinate the jobs<br />

envisaged here, receive instructions from Engineer-In-Charge and ensure<br />

satisfactory per<strong>for</strong>mance <strong>of</strong> services. No extra payment shall be made on this<br />

account as the quoted rates deemed to include the same.<br />

1.27 The Contractor shall make arrangement <strong>for</strong> all tools & tackles, refrigerant gas,<br />

testing equipments like Haldio Torch, Vacuum Pump, pressure testing equipments,<br />

gas charging equipments etc. required <strong>for</strong> attending breakdown and scheduled<br />

<strong>maintenance</strong> <strong>of</strong> the Windows/Split type AC units, Water Coolers, Refrigerators, etc<br />

as required. The Contractor shall keep/maintain proper tools to carry out the<br />

<strong>maintenance</strong> jobs to keep all the equipments functional. It shall be the<br />

responsibility <strong>of</strong> the Contractor to arrange and provide all required<br />

spares/consumables etc. <strong>for</strong> the subject job. The Contractor shall provide all spares<br />

from the original equipment manufacturers.<br />

In case <strong>of</strong> failure <strong>of</strong> Contractor to attend any fault <strong>for</strong> want <strong>of</strong> proper tools or<br />

spares, within specified time as mentioned in the said Document, the penalty as per<br />

Clause shall be applicable.<br />

1.0 All tools & tackles required <strong>for</strong> the job shall be within the scope <strong>of</strong> the Contractor.<br />

In case, the electric motors and compressor seized/damaged, the Contractor shall<br />

make replacement from the original manufacturer as the case may be.<br />

2.0 The rates mentioned in the schedule <strong>of</strong> rates shall remain firm <strong>for</strong> the entire<br />

duration <strong>of</strong> <strong>contract</strong>. The rates quoted in schedule <strong>of</strong> rates are inclusive <strong>of</strong> all tools,<br />

Contractor’s supervision, transportation, overheads, pr<strong>of</strong>its, all consumables/nonconsumables<br />

and the actual work <strong>of</strong> installation <strong>of</strong> the items.<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!