) The Contractor shall be solely liable to obtain and to abide by all necessary<br />
licenses/permissions from the concerned authorities as provided under the various<br />
Labour Law legislations including labour license from the competent authority under<br />
the Contract Labour (Regulation & Abolition Act 1970).<br />
c) The Contractor shall also be bound to discharge obligations as provided under<br />
various statutory enactments including the Employees Provident Fund &<br />
Miscellaneous Act, 1952, ESI Act, 1970). Minimum Wages Act 1936, Workmen's<br />
Compensation Act, 1923 and other relevant Acts, Rules and Regulations en<strong>for</strong>ced<br />
from time to time.<br />
d) The Contractor shall regularly submit all relevant records/documents in this regard<br />
(salary sheet/PF & ESIC Challans, etc) to <strong>GAIL</strong> representative <strong>for</strong> verification and<br />
upon such satisfaction only, <strong>GAIL</strong> will allow reimbursement <strong>of</strong> the monthly running<br />
bills.<br />
e) The Contractor shall ensure and shall be solely responsible <strong>for</strong> payment <strong>of</strong> wages and<br />
other dues latest by 7th <strong>of</strong> the following month to the personnel deployed by him.<br />
The Contractor shall be directly responsible and indemnify the company against all<br />
charges, claims, dues, etc. arising out <strong>of</strong> disputes relating to the dues and<br />
employment <strong>of</strong> personnel deployed by him.<br />
f) The Contractor shall indemnify the Company against all losses or damages caused to<br />
it on account <strong>of</strong> acts <strong>of</strong> the personnel deployed by the Contractor.<br />
The Contractor shall ensure regular and effective supervision <strong>of</strong> the personnel<br />
deployed by him.<br />
1.11 The materials required to replace should be <strong>of</strong> same make, design and quality as<br />
used/installed originally or else permission should be taken from Engineer-in-Charge<br />
to use different make.<br />
1.12 In case <strong>of</strong> any replacement <strong>of</strong> the material or fresh procurement or repairing<br />
through outside agencies (items which are not mentioned in the BOQ) is required,<br />
the Contractor shall supply /get done the same after in<strong>for</strong>ming the Engineer-incharge.<br />
The cost <strong>of</strong> item & service charges will be paid to the Contractor as per<br />
production <strong>of</strong> purchase voucher plus 10% extra. Further, in any <strong>maintenance</strong><br />
job/manpower <strong>for</strong> which there is no categorical mention in the tender, the same<br />
work shall be got executed at the market rate and the <strong>contract</strong>or shall be paid 10%<br />
extra on the actual expenditure incurred by the Contractor towards his pr<strong>of</strong>its and<br />
overheads. The bill <strong>for</strong> carrying out such jobs should be duly certified by Engineerin-charge.<br />
1.13 The 10% extra payable to the Contractor on account <strong>of</strong> materials and other<br />
expenditure payable as per tender conditions includes pr<strong>of</strong>it, overheads, conveyance,<br />
transportation, watch and ward, etc.<br />