) The Contractor shall be solely liable to obtain and to abide by all necessary<br />

licenses/permissions from the concerned authorities as provided under the various<br />

Labour Law legislations including labour license from the competent authority under<br />

the Contract Labour (Regulation & Abolition Act 1970).<br />

c) The Contractor shall also be bound to discharge obligations as provided under<br />

various statutory enactments including the Employees Provident Fund &<br />

Miscellaneous Act, 1952, ESI Act, 1970). Minimum Wages Act 1936, Workmen's<br />

Compensation Act, 1923 and other relevant Acts, Rules and Regulations en<strong>for</strong>ced<br />

from time to time.<br />

d) The Contractor shall regularly submit all relevant records/documents in this regard<br />

(salary sheet/PF & ESIC Challans, etc) to <strong>GAIL</strong> representative <strong>for</strong> verification and<br />

upon such satisfaction only, <strong>GAIL</strong> will allow reimbursement <strong>of</strong> the monthly running<br />

bills.<br />

e) The Contractor shall ensure and shall be solely responsible <strong>for</strong> payment <strong>of</strong> wages and<br />

other dues latest by 7th <strong>of</strong> the following month to the personnel deployed by him.<br />

The Contractor shall be directly responsible and indemnify the company against all<br />

charges, claims, dues, etc. arising out <strong>of</strong> disputes relating to the dues and<br />

employment <strong>of</strong> personnel deployed by him.<br />

f) The Contractor shall indemnify the Company against all losses or damages caused to<br />

it on account <strong>of</strong> acts <strong>of</strong> the personnel deployed by the Contractor.<br />

The Contractor shall ensure regular and effective supervision <strong>of</strong> the personnel<br />

deployed by him.<br />

1.11 The materials required to replace should be <strong>of</strong> same make, design and quality as<br />

used/installed originally or else permission should be taken from Engineer-in-Charge<br />

to use different make.<br />

1.12 In case <strong>of</strong> any replacement <strong>of</strong> the material or fresh procurement or repairing<br />

through outside agencies (items which are not mentioned in the BOQ) is required,<br />

the Contractor shall supply /get done the same after in<strong>for</strong>ming the Engineer-incharge.<br />

The cost <strong>of</strong> item & service charges will be paid to the Contractor as per<br />

production <strong>of</strong> purchase voucher plus 10% extra. Further, in any <strong>maintenance</strong><br />

job/manpower <strong>for</strong> which there is no categorical mention in the tender, the same<br />

work shall be got executed at the market rate and the <strong>contract</strong>or shall be paid 10%<br />

extra on the actual expenditure incurred by the Contractor towards his pr<strong>of</strong>its and<br />

overheads. The bill <strong>for</strong> carrying out such jobs should be duly certified by Engineerin-charge.<br />

1.13 The 10% extra payable to the Contractor on account <strong>of</strong> materials and other<br />

expenditure payable as per tender conditions includes pr<strong>of</strong>it, overheads, conveyance,<br />

transportation, watch and ward, etc.<br />