Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Procurement of amc(annual maintenance contract) for hvac ... - GAIL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
deemed to include and cover all costs, expenses and<br />
liabilities <strong>of</strong> every description and all risks <strong>of</strong> every kind to<br />
be taken in executing, completing and handing over the<br />
WORK to the EMPLOYER by the CONTRACTOR. The<br />
CONTRACTOR shall be deemed to have known the<br />
nature, scope, magnitude and the extent <strong>of</strong> the WORK and<br />
materials required though the CONTRACT DOCUMENT<br />
may not fully and precisely furnish them. Tenderer's shall<br />
make such provision in the Schedule <strong>of</strong> Rates as he may<br />
consider necessary to cover the cost <strong>of</strong> such items <strong>of</strong><br />
WORK and materials as may be reasonable and necessary<br />
to complete the WORK. The opinion <strong>of</strong> the<br />
ENGINEER-IN-CHARGE as to the items <strong>of</strong> WORK which<br />
are necessary and reasonable <strong>for</strong> COMPLETION OF<br />
WORK shall be final and binding on the CONTRACTOR,<br />
although the same may not be shown on or described<br />
specifically in CONTRACT DOCUMENTS.<br />
Generality <strong>of</strong> this present provision shall not be deemed to<br />
cut down or limit in any way because in certain cases it<br />
may and in other cases it may not be expressly stated that<br />
the CONTRACTOR shall do or per<strong>for</strong>m a work or supply<br />
articles or per<strong>for</strong>m services at his own cost or without<br />
addition <strong>of</strong> payment or without extra charge or words to the<br />
same effect or that it may be stated or not stated that the<br />
same are included in and covered by the Schedule <strong>of</strong><br />
Rates.<br />
iii) SCHEDULE OF RATES TO COVER<br />
CONSTRUCTION EQUIPMENTS, MATERIALS, LABOUR<br />
ETC.:<br />
Without in any way limiting the provisions <strong>of</strong> the preceding<br />
sub-clause the Schedule <strong>of</strong> Rates shall be deemed to<br />
include and cover the cost <strong>of</strong> all construction equipment,<br />
temporary WORK (except as provided <strong>for</strong> herein), pumps,<br />
materials, labour, insurance, fuel, consumables, stores and<br />
appliances to be supplied by the CONTRACTOR and all<br />
other matters in connection with each item in the Schedule<br />
<strong>of</strong> Rates and the execution <strong>of</strong> the WORK or any portion<br />
there<strong>of</strong> finished, complete in every respect and maintained<br />
as shown or described in the CONTRACT DOCUMENTS<br />
or as may be ordered in writing during the continuance <strong>of</strong><br />
the CONTRACT.<br />
iv) SCHEDULE OF RATES TO COVER ROYALTIES,<br />
RENTS AND CLAIMS:<br />
The Schedule <strong>of</strong> Rates (i.e., VALUE OF CONTRACT) shall<br />
be deemed to include and cover the cost <strong>of</strong> all royalties and<br />
fees <strong>for</strong> the articles and processes, protected by letters,<br />
patent or otherwise incorporated in or used in connection<br />
with the WORK, also all royalties, rents and other payments<br />
in connection with obtaining materials <strong>of</strong> whatsoever kind<br />
<strong>for</strong> the WORK and shall include an indemnity to the<br />
EMPLOYER which the CONTRACTOR hereby gives<br />
against all actions, proceedings, claims, damages, costs<br />
and expenses arising from the incorporation in or use on<br />
the WORK <strong>of</strong> any such articles, processes or materials,<br />
octroi or other municipal or local Board Charges, if levied<br />
Page 103 <strong>of</strong> 158