e<strong>for</strong>e obtaining the approval in writing <strong>of</strong> the Engineer-in-Charge.<br />

The CONTRACTOR is to provide at all time during the progress <strong>of</strong><br />

the WORK and the <strong>maintenance</strong> period, proper means <strong>of</strong> access<br />

with ladders, gangways etc. and the necessary attendance to move<br />

and adopt as directed <strong>for</strong> inspection or measurements <strong>of</strong> the WORK<br />

by the ENGINEER- IN-CHARGE.<br />

73.3 The CONTRACTOR shall make available to the ENGINEER-IN-<br />

CHARGE free <strong>of</strong> cost all necessary instruments and assistance in<br />

checking or setting out <strong>of</strong> WORK and in the checking <strong>of</strong> any WORK<br />

made by the CONTRACTOR <strong>for</strong> the purpose <strong>of</strong> setting out and<br />

taking measurements <strong>of</strong> WORK.<br />

74 Tests <strong>for</strong> quality <strong>of</strong> work: 74.1 All workmanship shall be <strong>of</strong> the respective kinds described in the<br />

CONTRACT DOCUMENTS and in accordance with the instructions<br />

<strong>of</strong> the ENGINEER-IN-CHARGE and shall be subjected from time to<br />

time to such test at CONTRACTOR's cost as the<br />

ENGINEER-IN-CHARGE may direct at the place <strong>of</strong> manufacture or<br />

fabrication or on the site or at all or any such places. The<br />

CONTRACTOR shall provide assistance, instruments, labour and<br />

materials as are normally required <strong>for</strong> examining, measuring and<br />

testing any workmanship as may be selected and required by the<br />

ENGINEER-IN-CHARGE.<br />

74.2 All the tests that will be necessary in connection with the execution<br />

<strong>of</strong> the WORK as decided by the ENGINEER- IN-CHARGE shall be<br />

carried out at the field testing laboratory <strong>of</strong> the EMPLOYER by<br />

paying the charges as decided by the EMPLOYER from time to<br />

time. In case <strong>of</strong> non- availability <strong>of</strong> testing facility with the<br />

EMPLOYER, the required test shall be carried out at the cost <strong>of</strong><br />

CONTRACTOR at Government or any other testing laboratory as<br />

directed by ENGINEER-IN-CHARGE.<br />

74.3 If any tests are required to be carried out in conjunction with the<br />

WORK or materials or workmanship not supplied by the<br />

CONTRACTOR, such tests shall be carried out by the<br />

CONTRACTOR as per instructions <strong>of</strong> ENGINEER-IN-CHARGE and<br />

cost <strong>of</strong> such tests shall be reimbursed by the EMPLOYER.<br />

75 Samples <strong>for</strong> approval: 75.1 The CONTRACTOR shall furnish to the ENGINEER-IN-CHARGE<br />

<strong>for</strong> approval, when requested or if required by the specifications,<br />

adequate samples <strong>of</strong> all materials and finished to be used in the<br />

WORK. Such samples shall be submitted be<strong>for</strong>e the WORK is<br />

commenced and in ample time to permit tests and examinations<br />

there<strong>of</strong>. All materials furnished and finishes applied in actual<br />

WORK shall be fully equal to the approved samples.<br />

76 Action and compensation in<br />

case <strong>of</strong> bad work:<br />

76.1 If it shall appear to the ENGINEER-IN-CHARGE that any work has<br />

been executed with unsound, imperfect or unskilled workmanship,<br />

or with materials <strong>of</strong> any inferior description, or that any materials or<br />

articles provided by the CONTRACTOR <strong>for</strong> the execution <strong>of</strong> the<br />

WORK are unsound, or <strong>of</strong> a quality inferior to that <strong>contract</strong>ed <strong>for</strong>, or<br />

otherwise not in accordance with the CONTRACT, the<br />

CONTRACTOR shall on demand in writing from the<br />

ENGINEER-IN-CHARGE or his authorised representative<br />

specifying the WORK, materials or articles complained <strong>of</strong><br />

notwithstanding that the same may have been inadvertently<br />

passed, certified and paid <strong>for</strong>, <strong>for</strong>thwith rectify or remove and<br />

reconstruct the WORK so specified and provide other proper and<br />

Page 97 <strong>of</strong> 158