interests involved shall be determined by the<br />

ENGINEER-IN-CHARGE to secure the completion <strong>of</strong> the<br />

various portions <strong>of</strong> the work in general harmony.<br />

43 Patents and royalties: 43.1 The CONTRACTOR, if licensed under any patent covering<br />

equipment, machinery, materials or compositions <strong>of</strong> matter to be<br />

used or supplied or methods and process to be practised or<br />

employed in the per<strong>for</strong>mance <strong>of</strong> this CONTRACT, agrees to pay<br />

all royalties and licence fees which may be due with respect<br />

thereto. If any equipment, machinery, materials, composition <strong>of</strong><br />

matters, be used or supplied or methods and processes to be<br />

practised or employed in the per<strong>for</strong>mance <strong>of</strong> this CONTRACT,is<br />

covered by a patent under which the CONTRACTOR is not<br />

licensed then the CONTRACTOR be<strong>for</strong>e supplying or using the<br />

equipment, machinery materials, composition method or<br />

processes shall obtain such licences and pay such royalties and<br />

licence fees as may be necessary <strong>for</strong> per<strong>for</strong>mance <strong>of</strong> this<br />

CONTRACT. In the event the CONTRACTOR fails to pay any<br />

such royalty or obtain any such licence, any suit <strong>for</strong> infringement<br />

<strong>of</strong> such patents which is brought against the CONTRACTOR or<br />

the EMPLOYER as a result such failure will be defended by the<br />

CONTRACTOR at his own expense and the CONTRACTOR will<br />

pay any damages and costs awarded in such suit. The<br />

CONTRACTOR shall promptly notify the EMPLOYER if the<br />

CONTRACTOR has acquired the knowledge <strong>of</strong> any plant under<br />

which a suit <strong>for</strong> infringement could be reasonably brought<br />

because <strong>of</strong> the use by the EMPLOYER <strong>of</strong> any equipment,<br />

machinery, materials, process, methods to be supplied<br />

hereunder. The CONTRACTOR agrees to and does hereby<br />

grant to EMPLOYER, together with the right to extend the same<br />

to any <strong>of</strong> the subsidiaries <strong>of</strong> the EMPLOYER as irrevocable,<br />

royalty free licence to use in any country, any invention made by<br />

the CONTRACTOR or his employee in or as result <strong>of</strong> the<br />

per<strong>for</strong>mance <strong>of</strong> the WORK under the CONTRACT.<br />

43.2 All charges on account <strong>of</strong> royalty. toilage, rent, octroi terminal or<br />

sales tax and/or other duties or any other levy on materials<br />

obtained <strong>for</strong> the work or temporary work or part there<strong>of</strong><br />

(excluding materials provided by the EMPLOYER) shall be borne<br />

by the CONTRACTOR.<br />

43.3 The CONTRACTOR shall not sell or otherwise dispose <strong>of</strong> or<br />

remove except <strong>for</strong> the purpose <strong>of</strong> this CONTRACT, the sand,<br />

stone, clay, ballast, earth, rock or other substances, or materials<br />

obtained from any excavation made <strong>for</strong> the purpose <strong>of</strong> the<br />

WORK or any building or produce upon the site at the time <strong>of</strong><br />

delivery <strong>of</strong> the possession there<strong>of</strong>, but all such substances,<br />

materials, buildings and produce shall be the property <strong>of</strong> the<br />

EMPLOYER provided that the CONTRACTOR may with the<br />

permission <strong>of</strong> the ENGINEER-IN-CHARGE, use the same <strong>for</strong> the<br />

purpose <strong>of</strong> the work by payment <strong>of</strong> cost <strong>of</strong> the same at such a<br />

rate as may be determined by the ENGINEER-IN- CHARGE.<br />

43.4 The EMPLOYER shall indemnify and save harmless the<br />

CONTRACTOR from any loss on account <strong>of</strong> claims against<br />

CONTRACTOR <strong>for</strong> the contributory infringement <strong>of</strong> patent rights<br />

arising out and based upon the claim that the use <strong>of</strong> the<br />

EMPLOYER <strong>of</strong> the process included in the design prepared by<br />

the EMPLOYER and used in the operation <strong>of</strong> the plant infringes<br />