27.12.2014 Views

Kilimanjaro - Tanzania Online Gateway

Kilimanjaro - Tanzania Online Gateway

Kilimanjaro - Tanzania Online Gateway

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Airport situated a few kilometers from Moshi Municipality mainly<br />

caters for non-commercial and charter air planes.<br />

3.5 Electricity:<br />

Electricity is most needed as an energy for development in a<br />

modern society and where it is lacking it becomes hard to engage<br />

in serious industrial development. The region's electricity is<br />

supplied by both Hydro and Thermal energy. Hydroelectricity is<br />

drawn from the National Grid (Kidatu/Hale Grid system supplying<br />

13.0 MW), Nyumba ya Mungu Station supplying 7.4 MW and<br />

Kikuletwa Station supplying 1.16 MW. Thermo electricity is<br />

mainly supplied by private institutions for their institutional needs.<br />

The largest Therm plants are stationed at Kome Hospital<br />

producing 92.0 KW, Kibo Match Factory producing 160.0<br />

KW., KCMC Hospital producing 92.0 KW and Sikh Saw Mills<br />

producing 84.0 KW. All the five districts and one Municipality<br />

are well served with hydro-electric power, with total number of<br />

15,826 consumers. The largest part of electricity is consumed by<br />

medium and light industries distributed all over the region.<br />

Out of 402 registered villages in the region, 116 villages, or<br />

29.9% of all villages in the region are supplied with electricity.<br />

Thus <strong>Kilimanjaro</strong> region commands a higher percentage of<br />

electricity distribution to villages and private households compared<br />

to other regions. The table below shows the number of villages<br />

and households supplied with electricity in the region.<br />

90

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!