30.12.2014 Views

Catalog PM 21 2013 - Siemens Industry, Inc.

Catalog PM 21 2013 - Siemens Industry, Inc.

Catalog PM 21 2013 - Siemens Industry, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

© <strong>Siemens</strong> AG <strong>2013</strong><br />

SINAMICS S120 drive system<br />

Power Modules and line-side components<br />

Liquid-cooled Power Modules<br />

in chassis format<br />

■ Characteristic curves<br />

Pressure drop<br />

Overload capability<br />

Pressure drop<br />

400<br />

kPa<br />

300<br />

200<br />

100<br />

0<br />

5<br />

10 15<br />

Water<br />

Antifrogen N/water at 0 °C (32 °F)<br />

and 45/55 Vol. %<br />

Pressure drop with frame size FL<br />

G_D<strong>21</strong>1_EN_00175<br />

20 l/min 25<br />

Volumetric flow<br />

The base-load current I L is based on a load cycle of 110 % for<br />

60 s or 150 % for 10 s with a load cycle period of 300 s.<br />

Current<br />

1.1 x I L<br />

I rated<br />

I L<br />

Low overload<br />

The base-load current I H is based on a load cycle of 150 % for<br />

60 s or 160 % for 10 s with a load cycle period of 300 s.<br />

Current<br />

60 s<br />

Short-time current<br />

Rated current (permanent)<br />

Base load current I L<br />

for low overload<br />

300 s<br />

G_D<strong>21</strong>3_EN_00007b<br />

G_D<strong>21</strong>3_EN_00008c<br />

t<br />

3<br />

Pressure drop<br />

400<br />

kPa<br />

300<br />

200<br />

1.5 x I H<br />

I rated<br />

I H<br />

60 s<br />

Short-time current<br />

Rated current (permanent)<br />

Base load current I H<br />

for high overload<br />

300 s<br />

100<br />

0<br />

5<br />

10 15 20 25 l/min 30<br />

Water<br />

Volumetric flow<br />

Antifrogen N/water at<br />

0 °C (32 °F) and 45/55 Vol. %<br />

G_D<strong>21</strong>1_EN_00176<br />

High overload<br />

max<br />

G_D<strong>21</strong>1_EN_00084a<br />

t<br />

Pressure drop with frame size GL<br />

S6<br />

rated<br />

0.7 x<br />

rated<br />

4 min<br />

10 min<br />

S6 load cycle with previous load with a load cycle period of 600 s<br />

<strong>Siemens</strong> <strong>PM</strong> <strong>21</strong> · <strong>2013</strong><br />

3/57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!