Graphic N° 42: “Ilo II” Thermal Power Station<br />
Source: Web site of ENERSUR (ENERSUR, 2011).<br />
1.6 Learned Lessons<br />
In 1992 came <strong>in</strong>to effect the “Electric Concessions Law”, L.D. Nº 28544, which<br />
modernized the Peruvian electricity market. Then this frame was modified by the<br />
“Law to Ensure the Efficient Development of Electric Power Generation”, Law<br />
Nº 28832, enacted <strong>in</strong> 2006. Later <strong>in</strong> 2008, it was approved the L.D. Nº 1002,<br />
“Law to Promote Investment <strong>in</strong> Electricity Generation with <strong>Renewable</strong> Energies”.<br />
There<strong>for</strong>e, it has passed over two decades to achieve a regulatory framework on<br />
renewable energies <strong>in</strong> the country.<br />
Even though the country has an important potential of renewable energy<br />
resources, it only has experience <strong>in</strong> the application of hydroelectric technologies<br />
<strong>and</strong> <strong>in</strong> the use of thermoelectric technologies to generate electricity with sugar<br />
cane bagasse. In addition, be<strong>for</strong>e the entrance <strong>in</strong> <strong>for</strong>ce of the current legal<br />
framework of renewable energies <strong>in</strong> May 2008, one of the barriers that have<br />
stopped the development of renewable energies was the application of tariffs that<br />
did not make viable the projects of electric generation with RER. Furthermore, a<br />
disadvantage <strong>for</strong> renewable energies is that these require the acceptance of higher<br />
tariffs to make them economically viable, which causes an impact <strong>in</strong> electricity<br />
tariffs <strong>for</strong> end users.<br />