Perú- Products I <strong>and</strong> II<br />


<br />

In each tender, the OSINERGMIN fixes a top price of award<strong>in</strong>g, which is not<br />

known by the bidders after open<strong>in</strong>g the envelopes. The power sales price is the<br />

one offered by each bidder <strong>and</strong> awarded, <strong>and</strong> the power price corresponds to the<br />

basic price of power (fixed by OSINERGMIN) valid till the day of the tender’s<br />

announcement, both prices have a strong character, so they will keep on dur<strong>in</strong>g<br />

the term of validity established <strong>in</strong> each tender <strong>for</strong> the contracts of supply.<br />

In the case of hydroelectric power station’s tenders, the law <strong>in</strong> mention establishes<br />

a discount factor (currently 15 %) to the economic offers <strong>for</strong> their evaluation,<br />

consider<strong>in</strong>g that those projects imply higher <strong>in</strong>vestmen costs <strong>in</strong> respect of thermal<br />

ones. Discount factors are applicable only <strong>for</strong> effects of the evaluation of supply<br />

<strong>in</strong> the tender process, because every awardee will always receive the price that<br />

had offered <strong>in</strong> the tender. Over this frame it has been execut<strong>in</strong>g the hydroelectric<br />

project “Quitaracsa” of 112 MW, which will get <strong>in</strong>to commercial transaction on<br />

April of 2014.<br />

Additionally, the MEM could order PRO-INVESTMENT to convoke <strong>and</strong> conduct<br />

tenders of electricity supply <strong>for</strong> a special technology, like hydroelectric power<br />

stations, with the same characteristics that establishes the framework of the Law<br />

Nº 28832. Thanks to the application of this mechanism the follow<strong>in</strong>g<br />

hydroelectric projects are under execution:<br />

• H. P. S. “Santa Teresa” of 90 MW (October, 2013).<br />

• H. P. S. “Cheves” of 168 MW (April, 2014).<br />

• H. P. S. “Pucará” of 150 MW, H. P. S. “Chaglla” of 360 MW <strong>and</strong> H. P.<br />

S. “Cerro del Águila” of 402 MW (January, 2016).<br />

In accordance with the valid general legal framework, every generator can<br />

commercialize its production under four (04) modes:<br />

a) Contracts with distributors, through electricity supply tenders that are<br />

convoked accord<strong>in</strong>g to their power needs <strong>for</strong> the supply of their<br />

regulated/free market, where the price has a fixed character <strong>and</strong> it is equal to<br />

the price that offers each generator.<br />

b) Contracts with distributors accord<strong>in</strong>g to their requierements to supply the its<br />

regulated market, where the price corresponds to the bus-bar tariff that the<br />

OSINERGMIN fixes.<br />

c) Contract with free users with a negotiated price.<br />

d) Transferences on the short term market managed by the COES, where is<br />

considerate the spot price or marg<strong>in</strong>al cost.<br />

It is expected that <strong>in</strong> very short term the total regulated market dem<strong>and</strong> would be<br />

supplied trough electricity supply<strong>in</strong>g tenders. This is the best mode to viable the<br />

<strong>in</strong>vestments <strong>in</strong> generation projects, because the long-term supply contracts (up to<br />

20 years) have a fixed price <strong>for</strong> the energy supplied accord<strong>in</strong>g to the needs of the<br />

distributor <strong>and</strong> to the energy offered to cover up that needs.<br />