PERÃ - Observatory for Renewable Energy in Latin America and
PERÃ - Observatory for Renewable Energy in Latin America and
PERÃ - Observatory for Renewable Energy in Latin America and
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<br />
Perú- Products I <strong>and</strong> II<br />
<br />
Chart N° 62: Summary of Interviews to Project’s Entrepreneurs<br />
Project Name Ma<strong>in</strong> goal Most important barriers<br />
Positive aspects of<br />
the policy <strong>and</strong> legal<br />
framework<br />
Needed to<br />
replicate the<br />
project<br />
How it benefits your<br />
community<br />
What government<br />
should do<br />
H.P.S. “La<br />
Joya”<br />
Javier Lei<br />
Suicho<br />
Develope a pilot<br />
scheme of efficient<br />
electricity generation<br />
which takes advantage<br />
of the energy available<br />
70 years ago.<br />
Lack of support <strong>and</strong><br />
absence of state-owned<br />
entities regard<strong>in</strong>g<br />
problems generated by the<br />
lack of <strong>in</strong><strong>for</strong>mation of the<br />
population.<br />
Initially, the energy<br />
tariffs <strong>and</strong> the<br />
stability of the legal<br />
<strong>and</strong> normative<br />
framework <strong>and</strong> then<br />
the modality of<br />
auctions.<br />
A detailed<br />
analysis at a<br />
technical level <strong>in</strong><br />
order to reduce the<br />
f<strong>in</strong>antial risk.<br />
<strong>Energy</strong> Canon<br />
energético. The bonds<br />
of CERs are conducted<br />
to benefit graduates of<br />
secondary school of<br />
local schools.<br />
Improve its <strong>in</strong>tervention<br />
on social problems,<br />
specify its attributions<br />
<strong>and</strong> <strong>in</strong>ter<strong>in</strong>stitutional<br />
competitions <strong>and</strong><br />
optimize the time to<br />
check the documents.<br />
T.P.S.<br />
“Paramonga<br />
I”<br />
Efraín Salas<br />
Valverde<br />
Hav<strong>in</strong>g a cogeneration<br />
station that allows<br />
generat<strong>in</strong>g enough<br />
steam <strong>for</strong> production<br />
us<strong>in</strong>g all the bagasse<br />
<strong>and</strong> wastes of the sugar<br />
cane crop as fuel.<br />
Dur<strong>in</strong>g the development of<br />
the project there were<br />
changes <strong>in</strong> cogeneration<br />
rules that delay obta<strong>in</strong><strong>in</strong>g<br />
the generation concession.<br />
The normative frame<br />
<strong>for</strong> RER generation<br />
promot<strong>in</strong>g it trough<br />
<strong>in</strong>centives, which<br />
allows the return of<br />
<strong>in</strong>vestment.<br />
The project is<br />
be<strong>in</strong>g replied <strong>in</strong><br />
other agribus<strong>in</strong>ess<br />
companies that<br />
produce sugar or<br />
cane alcohol.<br />
Diversification of<br />
<strong>in</strong>comes of the plant,<br />
guarantee<strong>in</strong>g its<br />
permanence <strong>in</strong> the<br />
zone, giv<strong>in</strong>g employ to<br />
1 400 people <strong>and</strong><br />
generat<strong>in</strong>g higher<br />
levels of economic<br />
activity.<br />
Exp<strong>and</strong> the biomass<br />
coverage <strong>in</strong> RER tenders<br />
or fix<strong>in</strong>g Price that<br />
guarantees the<br />
<strong>in</strong>vestment.