05.01.2015 Views

PERÚ - Observatory for Renewable Energy in Latin America and

PERÚ - Observatory for Renewable Energy in Latin America and

PERÚ - Observatory for Renewable Energy in Latin America and

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.


<br />

Perú- Products I <strong>and</strong> II<br />


<br />

Country<br />

Station name<br />

Location<br />

Type of technology<br />

Chart N° 26: “Carhuaquero IV” Hydroelectric Power Station<br />

Parameter Units In<strong>for</strong>mation<br />

Peru<br />

Carhuaquero IV<br />

Llama, Chota, Cajamarca<br />

Water turb<strong>in</strong>e<br />

Date of Operation Start 27 of May, 2008<br />

Type os service (Public, Non Public)<br />

Legal Situation (Public Company/Limited<br />

Company/Public Limited Company/Public//Private)<br />

Modality<br />

Concessionary<br />

Public<br />

Private<br />

Private<br />

Nº of Permission granted 150-2001-EM<br />

DUKE ENERGY EGENOR S.A.<br />

Reference year 31 of September, 2001<br />

Nom<strong>in</strong>al Power MW 10<br />

Effective Power MW 9.98<br />

Generated Power (produced) GWh/year 42<br />

% of sold energy/delivered to the public service % 100<br />

Capacity factor of the power plant % 76<br />

Efficiency % ---<br />

Source of energy used<br />

Power consumption <strong>in</strong> the reference year PJ ---<br />

Investment Million US$ 6.4<br />

Operation costs <strong>and</strong> fixed ma<strong>in</strong>tenance Million US$ n/d<br />

Operation costs <strong>and</strong> variable ma<strong>in</strong>tenance Million US$ n/d<br />

Operation <strong>and</strong> ma<strong>in</strong>tenance cost Million US$ n/d<br />

Hydropower<br />

Sold energy price US$/MWh 70<br />

CO 2 Emissions that have been avoided Million ton/year 24 609<br />

Brief description<br />

Sources of <strong>in</strong><strong>for</strong>mation<br />

The station <strong>in</strong>tegrates the hydraulic<br />

<strong>in</strong>frastructures of the H.P.S. Carhuaquero <strong>for</strong> its<br />

operation like collect<strong>in</strong>g, conduction <strong>and</strong> pique,<br />

us<strong>in</strong>g the water resources of the the area.<br />

MEM<br />

SEIN<br />

70


Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!