Perú- Products I <strong>and</strong> II<br />


<br />

c) F<strong>in</strong>anc<strong>in</strong>g<br />

The ma<strong>in</strong> difficulty to obta<strong>in</strong> f<strong>in</strong>anc<strong>in</strong>g <strong>in</strong> Peru was not count<strong>in</strong>g on long-term<br />

contracts <strong>for</strong> the sale of energy at a fixed price, grant<strong>in</strong>g a flow of <strong>in</strong>come that<br />

guarantees the return of <strong>in</strong>vestment. This aspect, added up with the two previous<br />

ones, has determ<strong>in</strong>ed that private <strong>in</strong>vestment look towards the construction of<br />

Thermal Power Stations based on natural gas <strong>in</strong>stead of Hydroelectric Power<br />

Stations, as they need smaller amounts of <strong>in</strong>vestment <strong>and</strong> shorter construction<br />

periods which let them generate <strong>in</strong>comes 4 years be<strong>for</strong>e a Hydroelectric Power<br />

Station.<br />

d) Bus-bar tariffs <strong>and</strong> Prices of Natural Gas<br />

In accordance with the dispositions established <strong>in</strong> the regulatory framework up to<br />

December of 2004, bus-bar tariffs 4 (MEM, 1992) that generators could hire <strong>for</strong><br />

energy sales to the distributors of the regulated market were fixed consider<strong>in</strong>g the<br />

promotional price of the Camisea natural gas <strong>for</strong> power generators. Thus<br />

determ<strong>in</strong>ed lower tariffs, that tak<strong>in</strong>g <strong>in</strong>to account the barriers described<br />

previously, made less attractive the <strong>in</strong>vestment <strong>in</strong> Hydroelectric Power Stations. It<br />

is convenient to po<strong>in</strong>t, that the first Thermal Power Station based on the Camisea<br />

natural gas, started its operation on August of 2004. There<strong>for</strong>e, the price of<br />

natural gas has been <strong>in</strong>directly a limitation factor <strong>in</strong> the development of<br />

Hydroelectric Power Stations.<br />

In addition, it is important to specify that the price of natural gas from Camisea,<br />

was fixed consider<strong>in</strong>g that it is a deposit discovered by Shell which was later<br />

returned to the State without any retribution to this company, so the costs<br />

accomplished <strong>in</strong> exploration were not considered to establish sales prices of the<br />

natural gas <strong>in</strong> wellhead <strong>for</strong> electric generators <strong>and</strong> <strong>in</strong>dustries.<br />

1.4.1.2 Measures To Promote the Investment <strong>in</strong> New Generation Supply<br />

The Law Nº 28832 is an important advance over the ECL, but it has some aspects<br />

that need to work <strong>in</strong>. This Law has as an objective improv<strong>in</strong>g the rules established<br />

<strong>in</strong> the ECL, <strong>in</strong> order to assure the sufficiency of efficient generation supply. Thus,<br />

it is reduced the exposition of the SEIN to the volatility of prices <strong>and</strong> the risks of<br />

extended ration<strong>in</strong>g <strong>for</strong> lack of energy, assur<strong>in</strong>g the f<strong>in</strong>al user an electric tariff<br />

more competitive.<br />

That Law is devoted to the promotion of <strong>in</strong>vestment <strong>in</strong> new generation supply,<br />

like hydroelectric power stations, through the mechanism of “electricity supply<br />

tenders convoked by the distributors”. The objective is reduc<strong>in</strong>g the<br />

adm<strong>in</strong>istrative <strong>in</strong>tervention <strong>in</strong> the generation price determ<strong>in</strong>ation through market<br />

solutions, <strong>in</strong> order to promote an effective competition <strong>and</strong> new generation<br />

<strong>in</strong>vestments.<br />




























































<br />

4 
Bus-Bar Tariffs are set based on basic prices, def<strong>in</strong>ed <strong>in</strong> the Article 47º of the “Electrical Concessions<br />

Law”, Articles 125º <strong>and</strong> 126º of its Regulantions, <strong>and</strong> the “Toll <strong>for</strong> Connection to the Ma<strong>in</strong> Transmission<br />

System”. Basic prices are constituted by the power <strong>and</strong> energy prices <strong>in</strong> the reference bars, from which<br />

prices are exp<strong>and</strong>ed by loss factors.