05.01.2015 Views

PERÚ - Observatory for Renewable Energy in Latin America and

PERÚ - Observatory for Renewable Energy in Latin America and

PERÚ - Observatory for Renewable Energy in Latin America and

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.


<br />

Perú- Products I <strong>and</strong> II<br />


<br />

of Greenhouse Gases – GHG, may purchase Certified Emission Reductions<br />

(CERs) of projects executed <strong>in</strong> develop<strong>in</strong>g countries. Peru could benefit from this<br />

mechanism because it ratified the Kyoto Protocol.<br />

The CDM recognizes the global environmental service of mitigation or absorption<br />

that is tak<strong>in</strong>g place at the develop<strong>in</strong>g countries <strong>for</strong> which the eligible projects<br />

should fulfill a series of basic requirements as: Contribution to the susta<strong>in</strong>able<br />

development, permanence of reductions <strong>and</strong> additionality. The stages <strong>for</strong> the<br />

development of CDM projects are shown <strong>in</strong> the Graphic Nº 23 <strong>and</strong> are detailed <strong>in</strong><br />

the follow<strong>in</strong>g paragraphs:<br />

1. Identification of the Project. It is usually prepared a profile <strong>for</strong> a previous<br />

evaluation <strong>and</strong> determ<strong>in</strong>ed if it is worth cont<strong>in</strong>u<strong>in</strong>g with advanced studies.<br />

2. Preparation of the Project Idea Note (PIN). Document with more detailed<br />

<strong>in</strong><strong>for</strong>mation used to <strong>in</strong>itiate negotiations of a future sale of CERs.<br />

3. Preparation of the Project Design Document (PDD). It is presented<br />

technical <strong>and</strong> organizational <strong>in</strong><strong>for</strong>mation of the activities of the project, be<strong>in</strong>g<br />

the ma<strong>in</strong> <strong>in</strong>put <strong>for</strong> validation, record <strong>and</strong> verification. It is described the base<br />

l<strong>in</strong>e methodology, estimates of reductions <strong>and</strong> the protocol of the project’s<br />

monitor<strong>in</strong>g, as well as environmental impacts <strong>and</strong> comments of the<br />

community that has been <strong>in</strong><strong>for</strong>med about the project.<br />

4. The Approval Procedure of Host Country. It is managed by the Designated<br />

National Authority (AND), which obta<strong>in</strong> <strong>in</strong><strong>for</strong>mation <strong>and</strong> summon an Ad Hoc<br />

Committee to evaluate if the project contributes to the susta<strong>in</strong>able<br />

development of the country. If the evaluation is positive, it is emitted the<br />

Approval Letter of the Host Country.<br />

5. The Validation. It is the previous step to the Registration <strong>in</strong> Executive Board<br />

of the CDM of UNFCCC. It iscarried out by a Designated Operational Entity<br />

(DOE) authorized <strong>in</strong> front of the executive board. Then the project is<br />

registered by the Executive Board; however, it can be observed <strong>and</strong> passed to<br />

a revision period, of which it would be registered or refused. Be<strong>for</strong>e emitt<strong>in</strong>g<br />

the Validation Report of the executive board of the CDM, it is necessary to<br />

count on the Approval Letter of the Host Country.<br />

6. Implementation <strong>and</strong> Monitor<strong>in</strong>g of the Project. It is realized by the<br />

proponent of the project <strong>in</strong> the phase called “implementation” to facilitate the<br />

later verification.<br />

7. The Verification/Certification: A DOE accomplishes the verification of the<br />

monitor<strong>in</strong>gs reports made by the proponent of the project <strong>and</strong> f<strong>in</strong>ally prepare a<br />

Verification Report <strong>and</strong> a Certification Report to be sent to the executive<br />

board of the Executive Board of the CDM. In such report it is established the<br />

34


Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!