PERÚ - Observatory for Renewable Energy in Latin America and

PERÚ - Observatory for Renewable Energy in Latin America and

PERÚ - Observatory for Renewable Energy in Latin America and

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.


<br />

Perú- Products I <strong>and</strong> II<br />


<br />

Of the projects awarded <strong>in</strong> the First Auction which fulfill the selection criterias<br />

mentioned be<strong>for</strong>e, there have been chosen the follow<strong>in</strong>g <strong>for</strong> the analysis of cases:<br />

‐ The Hydroelectric Power Station “Santa Cruz II”.<br />

‐ The Cogeneration Plant “Paramonga I”.<br />

The follow<strong>in</strong>g is a description of these projects.<br />

2.3 H.P.S. “Santa Cruz II”<br />

2.3.1 General Description of the Project<br />

The Hydroelectric Power Station “Santa Cruz II” is located northwest of Lima, 2<br />

104,5 meters above sea level, <strong>in</strong> the bas<strong>in</strong> of the river “Blanco” (Santa Cruz), <strong>in</strong><br />

the district of Santa Cruz, Huaylas's prov<strong>in</strong>ce, Ancash's department. It is a Runof-the-river<br />

Hydroelectric Power Station with 6 MW of <strong>in</strong>stalled capacity which<br />

takes advantage of the “Blanco” river waters. It entered <strong>in</strong>to commercial<br />

transaction <strong>in</strong> June of 2010 with an estimated generation of 33 GWh/year. The<br />

generated energy is placed <strong>in</strong> the short-term market <strong>and</strong> liquidated at Awarded<br />

Tariff <strong>for</strong> be<strong>in</strong>g a RER generator. The price of the energy that was bid by this<br />

station <strong>in</strong> the First Auction of <strong>Renewable</strong> Energies was of 55 US$/MWh.<br />

(OSINERGMIN, 2011a)<br />

Graphic N° 44: Geographic Location of the Project<br />

Source: CENERGIA<br />

2.3.2 Objectives of the Project<br />

The Hydroelectric Company “Santa Cruz”, is a company especially created <strong>for</strong><br />

the construction <strong>and</strong> start<strong>in</strong>g of the Hydroelectric Power Station “Santa Cruz I”,<br />

which has 5,9 MW of <strong>in</strong>stalled capacity <strong>and</strong> got <strong>in</strong>to operation <strong>in</strong> May of 2009.<br />

Dur<strong>in</strong>g its construction <strong>and</strong> start<strong>in</strong>g, it was noticed the existence of an additional<br />

hydroelectric potential untapped. From the confirmation <strong>and</strong> evaluation of the<br />

resource, it was determ<strong>in</strong>ed that the additional potential could be used to generate<br />

other 6 MW. In consequence, the developers of the project put <strong>for</strong>ward the<br />

implementation of another Hydroelectric Power Station: “Santa Cruz II”. This<br />

will consolidate the two ma<strong>in</strong> objectives of the project, namely:<br />