Perú- Products I <strong>and</strong> II<br />


<br />

Chart N° 60: Necessary documents to request generation authorization<br />

N° Requirement<br />

Application accord<strong>in</strong>g to <strong>for</strong>mat, detail<strong>in</strong>g the RUC number, addressed to the General Directorate of<br />

1<br />

Electricity, signed by the legal representative.<br />

2 Payment of TUPA (40% of UIT)<br />

Document (Public Act with a seal on which figures registration, sheet or electronic certificate) prov<strong>in</strong>g<br />

3<br />

registration <strong>in</strong> the Public Records of Incorporation of the company<br />

Document (Sheet or electronic certificate) prov<strong>in</strong>g registration <strong>in</strong> the Public Records of the company's<br />

4<br />

legal representative<br />

The follow<strong>in</strong>g maps <strong>and</strong> diagrams:<br />

• Delimitation of the concession area <strong>in</strong> UTM coord<strong>in</strong>ates (DATUM PSAD 56) with signature <strong>and</strong><br />

5 seal of the responsible professional.<br />

• Poligonal Map with vertex <strong>in</strong> UTM coord<strong>in</strong>ates (PSAD 56).<br />

• S<strong>in</strong>gle-l<strong>in</strong>e diagram with signature <strong>and</strong> seal of the professional.<br />

Affidavit of compliance with technical st<strong>and</strong>ards of environmental <strong>and</strong> cultural heritage of the Nation<br />

6 conservation (Applicable only <strong>for</strong> f<strong>in</strong>al concessions <strong>for</strong> <strong>Renewable</strong> <strong>Energy</strong> generation whose <strong>in</strong>stalled<br />

capacity is less than or equal to 20 MW).<br />

Statement with project’s studies with signature <strong>and</strong> seal of the legal representative (at least at a feasibility<br />

7<br />

level).<br />

Schedule of work’s execution, <strong>in</strong>dicat<strong>in</strong>g the beg<strong>in</strong>n<strong>in</strong>g <strong>and</strong> putt<strong>in</strong>g <strong>in</strong>to comercial transection (<strong>in</strong> case of<br />

8<br />

new works) with signature <strong>and</strong> seal of the legal representative.<br />

9 Project Budget, with signature <strong>and</strong> seal of the legal representative.<br />

Technical <strong>in</strong><strong>for</strong>mation <strong>for</strong> statistical purposes: <strong>in</strong>stalled capacity of the station, number of generation<br />

units, type of each generation unit, model, design flow, specific fuel consumption, fuel type. In the case<br />

of electricity generation stations that are <strong>in</strong> use or repower<strong>in</strong>g there will also be presented the historical<br />

10<br />

records of operation <strong>and</strong> relevant <strong>in</strong><strong>for</strong>mation that supports an adequate operat<strong>in</strong>g per<strong>for</strong>mance<br />

(Applicable only <strong>for</strong> f<strong>in</strong>al concessions <strong>for</strong> <strong>Renewable</strong> <strong>Energy</strong> generation whose <strong>in</strong>stalled capacity is less<br />

than or equal to 20 MW).<br />

11 Current Skill Certificate of the eng<strong>in</strong>eer <strong>in</strong> charge of maps.<br />

Verifiable support of <strong>in</strong>vestor’s commitments <strong>for</strong> the supply of capital <strong>in</strong> the execution of works <strong>in</strong> case<br />

12<br />

of generation concession.<br />

Favorable report issued by a qualified Risk Rat<strong>in</strong>g Entity with respect to the f<strong>in</strong>ancial solvency of the<br />

13<br />

petitioner or potential <strong>in</strong>vestor, <strong>in</strong> case of generation concession.<br />

Guarantee of loyal fulfillment <strong>for</strong> execution of works, equivalent to 1% of the project budget with a<br />

19 ceil<strong>in</strong>g of 500 UITs <strong>in</strong> benefit of the M<strong>in</strong>istry of <strong>Energy</strong> <strong>and</strong> M<strong>in</strong>es, valid until the start of commercial<br />

transaction of the project.<br />

Source: MEM –TUPA.<br />

For the request of generation concession, <strong>in</strong> addition to the payment of 50 % of<br />

the TUPA, it is dem<strong>and</strong>ed the presentation of the follow<strong>in</strong>g documents:<br />

‐ Specification of the required servants.<br />

‐ Approval certificate emitted by the COES, supported with a Study of Pre-<br />

Operativeness (which must be <strong>in</strong>troduced be<strong>for</strong>e the expedition of the<br />

Supreme Resolution of grant<strong>in</strong>g of the f<strong>in</strong>al concession).<br />

On January 19 of 2010, the M<strong>in</strong>istry of <strong>Energy</strong> <strong>and</strong> M<strong>in</strong>es, by Supreme<br />

Resolution Nº 002 – 2009 – EM, gave the f<strong>in</strong>al generation concession based on<br />