PERÃ - Observatory for Renewable Energy in Latin America and
PERÃ - Observatory for Renewable Energy in Latin America and
PERÃ - Observatory for Renewable Energy in Latin America and
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<br />
Perú- Products I <strong>and</strong> II<br />
<br />
Country<br />
Station name<br />
Location<br />
Type of technology<br />
Chart N° 28: “Yanapampa” Hydroelectric Power Station<br />
Parameter Units In<strong>for</strong>mation<br />
Peru<br />
Yanapampa<br />
Yanapampa, Ocros, Ancash<br />
Water turb<strong>in</strong>e<br />
Date of Operation Start 01 of December, 2012<br />
Type os service (Public, Non Public)<br />
Legal Situation (Public Company/Limited<br />
Company/Public Limited Company/Public//Private)<br />
Modality<br />
Concessionary<br />
Public<br />
Private<br />
Private<br />
Eléctrica Yanapampa S.A.C.<br />
Nº of Permission granted 525-2008-MEM/DM<br />
Reference year 15 of November of 2008<br />
Nom<strong>in</strong>al Power MW 4.5(*)<br />
Effective Power MW ---<br />
Generated Power (produced) GWh/year 64.77<br />
% of sold energy/delivered to the public service % 100<br />
Capacity factor of the power plant % 77.43<br />
Efficiency % ---<br />
Source of energy used<br />
Power consumption <strong>in</strong> the reference year PJ ---<br />
Investment Million US$ 14.8<br />
Operation costs <strong>and</strong> fixed ma<strong>in</strong>tenance Million US$ n/d<br />
Operation costs <strong>and</strong> variable ma<strong>in</strong>tenance Million US$ n/d<br />
Operation <strong>and</strong> ma<strong>in</strong>tenance cost Million US$ n/d<br />
Sold energy price US$/MWh 56<br />
Hydropower<br />
CO 2 Emissions that have been avoided Million ton/year 26 366<br />
Brief description<br />
Hydroelectric Power Station <strong>in</strong> its First<br />
Stage. It has 3 turb<strong>in</strong>es type Francis of 1.5<br />
MW.<br />
Sources of <strong>in</strong><strong>for</strong>mation<br />
MEM<br />
SEIN<br />
(*)The project consists <strong>in</strong> the implementation of a Run-of-the-river Hydroelectric Power Station of 9<br />
MW <strong>in</strong> 2 stages, the second stage would be operative 2 years afeter the first one.<br />
72