Perú- Products I <strong>and</strong> II<br />
<br />
verified amount of Emission Reductions <strong>for</strong> the correspond<strong>in</strong>g emission of<br />
CERs.<br />
8. Emission of CERs<br />
Graphic N° 23: Cycle of the CDM Project<br />
In Peru, the Designated National Authority (DNA) is the M<strong>in</strong>istry of the<br />
Environment (MINAM). The Director of the General Directorate of Climate<br />
Change, Desertification <strong>and</strong> Water Resources (DGCCDRH), is responsible <strong>for</strong><br />
conven<strong>in</strong>g the Ad Hoc Committee <strong>and</strong> giv<strong>in</strong>g an answer <strong>for</strong> the con<strong>for</strong>mity or non<br />
con<strong>for</strong>mity of the Project, <strong>for</strong> which it is followe the “The Evaluation Procedure<br />
<strong>for</strong> the Approval of Projects of Greenhouse Gases Emissions’s Reduction <strong>and</strong><br />
Carbon Capture” Approved by Directive Nº 002-2009 MINAM.<br />
The Carbon Market promoter entity <strong>in</strong> Peru is the National Environment Fund<br />
(FONAM), which is a non profit <strong>in</strong>stitution of private rigth <strong>in</strong> charge of<br />
promot<strong>in</strong>g public <strong>and</strong> private <strong>in</strong>vestment <strong>in</strong> the development of priority<br />
environmental projects; it also prepares <strong>and</strong> gives advice <strong>in</strong> the preparation of<br />
CDM projects on its whole cycle.<br />
The Peruvian CDM Project Portfolio that FONAM manages has had an important<br />
growth as it is shown <strong>in</strong> Graphic Nº 24. In 2010, it was managed a portfolio of<br />
190 projects with a total amount of <strong>in</strong>vestment of 11 400 million US$. Till April<br />
of 2011 there were 223 projects, of which 51 count with the Approval Letter<br />
granted by the MINAM, be<strong>in</strong>g 23 of them registered <strong>in</strong> the executive board of the<br />
CDM. Of the registered projects, 10 receive 1 377 402 CER's <strong>and</strong> 6 of them<br />
correspond to Hydroelectric Power Stations. See Chart Nº 10.<br />