Perú- Products I <strong>and</strong> II<br />


<br />

In addition, <strong>in</strong> the f<strong>in</strong>anc<strong>in</strong>g of the project participated INTERBANK, f<strong>in</strong>ance<br />

entity belong<strong>in</strong>g to the local bank<strong>in</strong>g system, which f<strong>in</strong>anced the project through<br />

the Leas<strong>in</strong>g mechanism. It is important to st<strong>and</strong> out the currently INTERBAK has<br />

a l<strong>in</strong>e of f<strong>in</strong>anc<strong>in</strong>g with SECO (State Secretariat of Economic Affairs of Swiss<br />

Confederation) directed to Peruvian companies that want to <strong>in</strong>vest <strong>in</strong><br />

environmental technologies. The objective of this f<strong>in</strong>anc<strong>in</strong>g method is the<br />

improvement of the environment.<br />

Additionally, the H.P.S. “Santa Cruz” qualified as a CDM project, hav<strong>in</strong>g as<br />

counterpart <strong>in</strong> the purchase of certificates of emissions reduction the company<br />

“Endesa Carbono S.L.” which contributions helped to improve the cash flow of<br />

the project <strong>and</strong> to give it susta<strong>in</strong>ability.<br />

2.3.4 Legal Aspects<br />

The H.P.S. “Santa Cruz II” is a project of hydrological use that starts its<br />

construction <strong>in</strong> January of 2009 <strong>and</strong> enters <strong>in</strong>to commercial transaction <strong>in</strong> June of<br />

2010. Dur<strong>in</strong>g the development of the project, the frame that regulated the market<br />

of the generation of electric power was governed basically by the pr<strong>in</strong>ciples<br />

conta<strong>in</strong>ed <strong>in</strong> the Electric Concessions Law (1992), its regulations (1993) <strong>and</strong> the<br />

Law to Ensure the Efficient Development of Electric Power Generation (2006).<br />

Later the project would be benefited by the Law to Promote Investment <strong>in</strong><br />

Electricity Generation with <strong>Renewable</strong> Energies L.D. Nº 1002 <strong>and</strong> its Regulations<br />

(2011).<br />

The Electric Concessions Law established that from a superior power of 0,5 MW,<br />

projects require authorization to develop activities of electricity generation. Then,<br />

with the enactment of the L.D. Nº 1002 <strong>and</strong> its Regulations, it was established<br />

that hydroelectric projects up to 20 MW require concession to receive a right that<br />

facilitates the obta<strong>in</strong><strong>in</strong>g of servitudes that belong to third parties. By hav<strong>in</strong>g an<br />

<strong>in</strong>stalled capacity of 6 MW, the hydroelectric company “Santa Cruz S.A.C.” fell<br />

with<strong>in</strong> the requirements of this st<strong>and</strong>ard.<br />

The Hydroelectric Company “Santa Cruz S.A.C.” requested def<strong>in</strong>ite concession<br />

of electricity generation with renewable energy resources through a document<br />

presented on September 10 of 2008. For the obta<strong>in</strong><strong>in</strong>g of that concession, the<br />

company requested the M<strong>in</strong>istry of <strong>Energy</strong> <strong>and</strong> M<strong>in</strong>es composed by the follow<strong>in</strong>g<br />

documents:<br />