6.4. Economics<br />

6.4 Economics<br />

When the pr<strong>of</strong>itability calculations in chapter 2 regarding the hotel were<br />

made, the thermodynamical EES model was not yet created, <strong>and</strong> hence<br />

the efficiencies, COP etc. had to be estimated - partially by looking at<br />

similar commercial products.<br />

It is now examined how the assumptions used in the Hotel case fit<br />

with the results <strong>of</strong> the EES model.<br />

W [kW] | Q [kW]<br />

1000<br />

900<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

EES model vs Hotel Case assumption<br />

141<br />

141<br />

268 292<br />

399 406<br />

Hotel Calculations<br />

Hot Water Heating<br />

Cooling Power<br />

Electricical Power<br />

Optimized Model<br />

Figure 6.7: The left bar shows the generation <strong>of</strong> electricity, cooling <strong>and</strong> heating in the Hotel<br />

Case calculations for the Hot Climate (based on estimated η el <strong>and</strong> COP). The right bar shows the<br />

output <strong>of</strong> the optimized EES model for the same <strong>fuel</strong> input (800kW). The hot water production<br />

has been set to 141kW as in the hotel calculations 9 .<br />

In the hotel case ”Hot Climate” the natural gas consumption was<br />

800kW in order to generate enough electricity for the hotel. So the <strong>fuel</strong><br />

input into the optimized EES model has been set to 800kW as well. In<br />

the hotel case it was decided that the total dem<strong>and</strong> <strong>of</strong> domestic hot water<br />

(141kW) should come from the waste heat. So in the EES model the ABS<br />

unit has only been allowed to use so big a fraction <strong>of</strong> the waste heat, that<br />

there was enough heat left to generate 141kW <strong>of</strong> hot water 10 .<br />

10 In all the previous EES simulations, the ABS unit has been allowed to extract as<br />

much energy from the exhaust gas as possible go generate a bigger amount <strong>of</strong> cooling<br />

<strong>and</strong> a smaller amount <strong>of</strong> hot water.<br />