“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

elevation <strong>of</strong> flooding, and the pipes are placed in watertight protective channels. Accordingly, there<br />

is no risk <strong>of</strong> flooding safety related SSCs through them. The domestic and rain waters are<br />

discharged directly into drain channel-1 without treatment and the possibility <strong>of</strong> reaching the water<br />

to the buildings is precisely through them.<br />

For the purposes <strong>of</strong> safety margins reassessment a review was per<strong>for</strong>med on two buildings<br />

<strong>of</strong> additional system <strong>for</strong> steam generator emergency makeup. The review is aimed at determining<br />

the risk <strong>of</strong> flooding in sewage network. Level 0,00 <strong>of</strong> additional system <strong>for</strong> steam generator<br />

emergency makeup is established as 35.60. During the review it was confirmed that two buildings<br />

<strong>of</strong> additional system <strong>for</strong> steam generator emergency makeup have siphon at elevation -4,50 = 31,10<br />

m which is discharged into shaft 1591 <strong>of</strong> Unit 3 and shaft 1766 <strong>of</strong> unit 4.<br />

The availability <strong>of</strong> these siphons determined the ability <strong>of</strong> returning <strong>of</strong> rainwater sewage and<br />

as a result, two buildings <strong>of</strong> additional system <strong>for</strong> steam generator emergency makeup can be<br />

flooded if the water elevation exceeds 31.10. The difference between the critical height <strong>of</strong> the<br />

flooding and MWL is -1,83 m, i.e. these buildings are likely to be flooded first through rainwater<br />

sewage. Obviously, the buildings <strong>of</strong> additional system <strong>for</strong> steam generator emergency makeup have<br />

margin <strong>of</strong> external flooding at MWL.<br />

In accordance with [89], only the pumps <strong>of</strong> additional system <strong>for</strong> steam generator<br />

emergency makeup will be affected by flooding <strong>of</strong> the building because they are located at<br />

elevation -3.00 m, which determines that it will be flooded with water level above 32.50 m. The<br />

loss <strong>of</strong> these pumps (1 ÷ 4 CEFWS PUMPS) is relevant only if spent fuel is in the reactor as they<br />

are part <strong>of</strong> an alternative logic <strong>of</strong> the primary circuit cooling through the secondary circuit at loss <strong>of</strong><br />

the design cooling system. ASSGEM pump system (1 ÷ 4 CEFWS PUMPS) is not related to<br />

cooling <strong>of</strong> spent nuclear fuel when it is in the SFP.<br />

Emergency diesel generators <strong>of</strong> additional system <strong>for</strong> steam generator emergency makeup<br />

remain available with their section <strong>for</strong> power supply <strong>of</strong> different systems, including pumps <strong>for</strong> spent<br />

fuel storage pool cooldown.<br />

Obviously, it follows from the flooding <strong>of</strong> building additional system <strong>for</strong> steam generator<br />

emergency makeup that there will be loss <strong>of</strong> the only alternative <strong>for</strong> cooling <strong>of</strong> the spent fuel by<br />

water-water cooling <strong>of</strong> the reactor by the steam generators <strong>for</strong> cases where the fuel is placed in the<br />

reactor under conditions <strong>of</strong> [46], [65], [66] (use <strong>of</strong> emergency cooling logic at failure <strong>of</strong> the<br />

standard logic - using ПР with ultimate heat sink <strong>for</strong> essential components service water supply).<br />

Since MWL does not affect the operation <strong>of</strong> standard logics <strong>for</strong> safety functions assurance, it<br />

can be assumed that the effect <strong>of</strong> flooding <strong>of</strong> the building <strong>of</strong> additional system <strong>for</strong> steam generator<br />

emergency makeup is expressed only in reduction <strong>of</strong> the number <strong>of</strong> systems capable <strong>of</strong> per<strong>for</strong>ming<br />

the same safety function.<br />

3.4.1.3.2 Units 5 and 6 <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />