“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

Initiating<br />

event<br />

Option<br />

and use <strong>of</strong> reserve in the boron control system tank)<br />

6 Loss <strong>of</strong> primary circuit cooling due to failure <strong>of</strong> emergency<br />

and planned cooldown system during the mode <strong>of</strong> outage<br />

cooldown <strong>of</strong> the primary circuit<br />

(Considered: drainage <strong>of</strong> ECCS three hydro accumulators<br />

and use <strong>of</strong> reserve in the boron control system tank)<br />

3 days after shutdown 25:51 h<br />

18 days after shutdown 50:12<br />

Time to fuel<br />

damage<br />

5.1.3.4 Loss <strong>of</strong> ultimate heat sink, in combination with station blackout (i.e. loss <strong>of</strong> <strong>of</strong>f-site<br />

and emergency power supply to the site)<br />

Simultaneous loss <strong>of</strong> power supply and ultimate heat sink is considered as:<br />

· Loss <strong>of</strong> <strong>of</strong>f-site power supply and all the stationary AC sources at the <strong>NPP</strong> site<br />

(emergency and additional DGs);<br />

· Loss <strong>of</strong> main ultimate heat sink, defined as loss <strong>of</strong> Danube river water intake<br />

structures.<br />

to:<br />

As a result <strong>of</strong> postulated <strong>of</strong>f-site initiating event it is assumed that loss <strong>of</strong> operability occurs<br />

· Open switchyards <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong>;<br />

· Emergency DGs;<br />

· Additional DGs;<br />

· Bank pumping stations and their structures, including DG;<br />

· Shaft pumping station.<br />

For accident management the following can be used<br />

· Mobile DG and their powered facilities;<br />

· Emergency water volume in the cold channel;<br />

· Pumps with own diesel motor, including fire-protection ones;<br />

· Category І loads <strong>of</strong> the power supply to discharging <strong>of</strong> the SS accumulator batteries;<br />

· Manually-operated valves;<br />

· Other structures operation <strong>of</strong> which is not affected by the initiating event.<br />

5.1.3.4.1 Time <strong>of</strong> independence <strong>of</strong> the site be<strong>for</strong>e fuel damage occurs due to loss <strong>of</strong> primary<br />

circuit water<br />

Below response <strong>of</strong> power units 5 and 6 is described at different operational conditions.<br />