17.04.2015 Views

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

Details <strong>of</strong> the duties <strong>of</strong> positions in the emergency plan and procedures <strong>for</strong> their<br />

implementation is given in the following documents: [28], [75]; from [124] to [127] and in [133].<br />

6.1.1.3 Measures taken to ensure optimal involvement <strong>of</strong> the personnel<br />

The structure and responsibilities <strong>of</strong> the MT are shown in Appendix 4.1.2.1-1 <strong>of</strong> [28] and<br />

Figure 6.1-1 demonstartes organization <strong>of</strong> emergency response.<br />

Figure 6.1-1: Structure <strong>of</strong> the Organization <strong>of</strong> Emergency Response in K<strong>NPP</strong><br />

The MT per<strong>for</strong>ms the following main tasks:<br />

· arranges <strong>for</strong> receipt <strong>of</strong> in<strong>for</strong>mation on condition <strong>of</strong> accidental structures and<br />

operating units;<br />

· manages activities on assessment <strong>of</strong> accident;<br />

· prepares decisions <strong>for</strong>:<br />

- taking <strong>of</strong> measures on protection <strong>of</strong> the personnel and on accident<br />

management;<br />

- establishment <strong>of</strong> additional reserve teams - if required;<br />

- shut down or maintaining in operation <strong>of</strong> non-accidental units;<br />

- supply <strong>of</strong> required materials, raw materials and spare parts <strong>for</strong> per<strong>for</strong>ming <strong>of</strong><br />

urgent repair-and-recovery activities;<br />

- requesting support from the National Headquarters on Control and<br />

Coordination (NHCC) and from Ministry <strong>of</strong> Economy, Energy and Tourism;<br />

- starting <strong>of</strong> recovery activities;<br />

- stoppage <strong>of</strong> activities according to Emergency Plan and restoration <strong>of</strong><br />

functional capabilities <strong>of</strong> accidental structures.<br />

· prepares and <strong>for</strong>wards messages to higher-level authorities and local municipal<br />

authorities, according to the flowchart provided in Appendix 6.9-1 <strong>of</strong> [28] and action plan<br />

<strong>for</strong> staff during an earthquake [74].<br />

164/202

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!