“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

available to allow <strong>for</strong> adequately arranging and effectively implementing all the required measures<br />

<strong>for</strong> recovery <strong>of</strong> access to switchgear 0,4 kV. For more detail <strong>for</strong> the time available see item 5.3.1.2<br />

<strong>of</strong> the report.<br />

In the early phase <strong>of</strong> accident process, ASSGEM can be used <strong>for</strong> per<strong>for</strong>mance <strong>of</strong> any one <strong>of</strong><br />

its functions. After the water level reaches <strong>Kozloduy</strong> <strong>NPP</strong> site, ASSGEM can be used only as an<br />

alternative source <strong>of</strong> supplying pool cooling pumps due to flooding <strong>of</strong> the basement <strong>of</strong> ASSGEM.<br />

The power supply from ASSGEM is guarantees <strong>for</strong> 72 hours as each EDG has at least 72 hours <strong>of</strong><br />

fuel inventory [45].<br />

As the ultimate heat sink from the heat exchanger <strong>for</strong> SFP cooling, at simultaneous loss <strong>of</strong><br />

<strong>of</strong>f-site power and emergency power supply from the diesel-generators in DGS-2, only the cooling<br />

water supplied from the diesel pumps to the fire pump station 2 will remain.<br />

Obviously, the SFP decay heat removal function can be ensured at selection <strong>of</strong> a scenario <strong>for</strong><br />

combination <strong>of</strong> the external events.<br />

At this scenario the only significant consequence is associated with the seismic impact itself,<br />

i.e. with possible falling <strong>of</strong> covering elements in the SFP. As stated in [41], at mechanical damage<br />

<strong>of</strong> the fuel, release <strong>of</strong> fission products from the gas gap <strong>of</strong> the fuel elements can be anticipated. This<br />

activity will be released into the environment, as the Central hall does not have the status <strong>of</strong> a<br />

confined compartment.<br />

It can be concluded that the degree <strong>of</strong> redundancy <strong>of</strong> SFP fuel cooling function was reduced<br />

to a greater extent than at independent effect <strong>of</strong> each external event included in the scenarios.<br />

In the event that be<strong>for</strong>e the earthquake and flooding, the fuel is placed in the reactor<br />

according to the conditions <strong>of</strong> [46], [65] and [66], then due to the loss <strong>of</strong> the ПР system and loss <strong>of</strong><br />

ASSGEM pumps, heat removal can be provided only by fire trucks and SG flow rate can be ensured<br />

by opening <strong>of</strong> SG SVs. [154],[155].<br />

Regardless <strong>of</strong> low energy release <strong>of</strong> the fuel, the effectiveness <strong>of</strong> application <strong>of</strong> such cooling<br />

logic should be analytically reviewed.<br />

At the assessment <strong>of</strong> applicability <strong>of</strong> the cooling logic with fire trucks the following<br />

complicating circumstances shall be considered:<br />

· the fire trucks owned by the <strong>Kozloduy</strong> <strong>NPP</strong> are situated opposite the entrance to<br />

units 5 and 6. This means that their access to points <strong>of</strong> connection will not be hampered by<br />

the water level. Building structures and facilities <strong>of</strong> the fire service are designed according<br />

to the national seismic standards. This means that they are guaranteed <strong>for</strong> seismic impacts<br />

with Кс=0.10, assuming non-linear de<strong>for</strong>mities and partial damages. This means that at an<br />

earthquake within the range <strong>of</strong> 0,26 < PGA ≤ 0,36g, the buildings under fire will be severely<br />

damaged or destroyed, thus, hindering release <strong>of</strong> the vehicle from the garages. There<strong>for</strong>e,<br />