“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

· protocols <strong>of</strong> SSCs periodic inspections are produced. The results <strong>of</strong> SSCs inspection<br />

according to programme [82] from 30.06.2011 are provided in the completion certificate<br />

[79].<br />

· automatic actions – emergency tripping system at an earthquake [80], item 7.2.4.2.3<br />

[7],[8].<br />

· automatic plant in<strong>for</strong>mation systems is established and integrated with similar<br />

national system conducting continuous radiation monitoring within 3 km zone.<br />

· other scheduled measures to prevent, recover from and restriction <strong>of</strong> accident<br />

consequences.<br />

Following the accident in Fukushima Detailed programme was developed <strong>for</strong> review and<br />

assessment <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> Co. preparedness <strong>for</strong> management and reduction <strong>of</strong> the consequences<br />

<strong>of</strong> beyond design basis accidents, external and internal impacts [84]. The results <strong>of</strong> the current work<br />

under the programme are summarized in the preliminary report [85].<br />

According to item 2.4.2 [85] the number <strong>of</strong> portable submersible pumps in Power<br />

Generation 2 should be optimized, considering more adequate response at internal; floodings.<br />

Efficient and additional measures were proposed considering enhancement <strong>of</strong> protection at external<br />

and internal impacts (Appendix No. 1, [85]), item 2.4.2 [85].<br />

Measures have been taken <strong>for</strong> development and updating <strong>of</strong> the emergency procedures <strong>for</strong><br />

OSY personnel actions at earthquake, flooding, fire and explosion in departments, where needed,<br />

item 2.8.2 [85].<br />

According to the in<strong>for</strong>mation <strong>of</strong> item 2.9.2 [85] the emergency crew capability to per<strong>for</strong>m<br />

the emergency plan and its procedures was tested realistically in an exercise <strong>for</strong> accident with<br />

earthquake and flooding. The persons responsible from the emergency activities management group<br />

according to the emergency procedure are familiarized with the procedure and properly follow it.<br />

2.5.3 Assessment <strong>of</strong> indirect effects <strong>of</strong> the earthquake<br />

2.5.3.1 Assessment <strong>of</strong> potential failures <strong>of</strong> SSCs not seismically qualified that can<br />

compromise heat removal to the ultimate heat sink by mechanical impact or by<br />

internal flooding<br />

Measures are provided to ensure that at destruction <strong>of</strong> elements with lower seismic class will<br />

not damage the SSCs required <strong>for</strong> nuclear installation shutdown and maintaining in safe shutdown<br />

mode.<br />

In this review general plant systems not seismically classified but important <strong>for</strong> coping with<br />

secondary post-earthquake effects are identified and analyzed. Measures taken to preserve their<br />

functionality during and after the earthquake are discussed.<br />

Within the framework <strong>of</strong> Modernization Programme [69] and [70] the following measures to<br />

prevent from seismically induced interactions have been analyzed and implemented:<br />