“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

The SFP heat removal system is two-channel. To ensure the system normal operation it is<br />

required to maintain operable at least 2 (out <strong>of</strong> 3) heat exchangers and 1 (out <strong>of</strong> 2) pumps.<br />

1.4.2.2.3 Heat removal systems AC power supply<br />

The pump sets on the SFP cooling system are category 1 loads and their power supply is<br />

ensured from two-trans<strong>for</strong>mer substation, which is in turn powered at blackout from backup diesel<br />

generator.<br />

1.4.2.2.4 Alternative cooling logics and equipment<br />

Alternative ultimate heat sink is the atmosphere at closed cooling system, through the spray<br />

pools by means <strong>of</strong> essential components service water supply system <strong>of</strong> Unit 4. Connection is<br />

provided fro emergency cooling water supply from Danube River through fire protection pump<br />

station -2.<br />

1.4.2.3 System <strong>for</strong> Collection and Return <strong>of</strong> Water Leakages from the Fuel Storage Pool<br />

It is used <strong>for</strong> collection and control <strong>of</strong> the leakages from the inter-lining area <strong>of</strong> the SFP,<br />

overflows <strong>of</strong> the compartments <strong>for</strong> storage <strong>of</strong> the SNF, intake compartment, compartment <strong>for</strong><br />

reloading <strong>of</strong> the fuel assemblies, transfer corridor and from the drainage collector <strong>of</strong> the sensors <strong>of</strong><br />

the I&C in the SFS; return <strong>of</strong> the leakages to the SNF compartment or supply to the active water<br />

sewage.<br />

1.4.2.4 Active sewage system<br />

Active sewage and drain water system is designed to collect, store and supply drain waters<br />

from SFS to auxiliary building 2 <strong>for</strong> processing.<br />

1.4.2.5 Ventilation System<br />

The system is designed to maintain normal climate <strong>for</strong> operation <strong>of</strong> the equipment, to prevent<br />

from spreading <strong>of</strong> radioactive contaminations, as well as to maintain air contamination with radio<br />

nuclides within permissible limits according to the attending personnel work safety standards.<br />

1.4.2.6 Radiation Monitoring System<br />

The SFS radiation monitoring system is designed <strong>for</strong> control <strong>of</strong> the main radiation<br />

parameters typical <strong>for</strong> the operation <strong>of</strong> the storage facility in all modes <strong>of</strong> operation including the<br />

design based accidents.<br />

1.4.2.7 AC power supply<br />

1.4.2.7.1 Auxiliary power supply distribution<br />