“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

1.3.2.5.1.1 Main cable routes and sections<br />

Off-site power supply <strong>of</strong> Units 5 and 6 <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> is through switchyard 400kV<br />

(working) and 220 kV switchyard (backup).<br />

Connections <strong>of</strong> 400 kV (to unit trans<strong>for</strong>mer) and 220 kV (<strong>for</strong> startup trans<strong>for</strong>mers <strong>of</strong> Unit 5)<br />

are implemented by overhead lines connecting the trans<strong>for</strong>mer <strong>of</strong> Units 5 and 6 sites with OSY.<br />

Backup trans<strong>for</strong>mers <strong>of</strong> unit 6 are supplied from 220kV switchyard via cable 220 kV, traced in the<br />

underground cable channel. The cable channel is provided with fire alarm system (section 8 from<br />

[7], [8]).<br />

Connections <strong>of</strong> 6 kV and 0.4 kV cables are made by cable located in protected areas,<br />

corridors, shafts and ducts, with automatic fire fighting and fire doors. All cables are coated with<br />

flame retardant coating. Cable connections from DGS to the safety systems sections are laid in<br />

autonomous cable ducts and premises.<br />

Backup power supply cable connections between the units and part <strong>of</strong> general plant facilities<br />

are placed on overpasses in special protective metal trays.<br />

1.3.2.5.1.2 Logics, layout and protection against internal and external influences<br />

Auxiliaries <strong>of</strong> Units 5 and 6 <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> during normal operation are powered by 24<br />

kV bus after the generator circuit breaker, auxiliary trans<strong>for</strong>mer with split coils 24/6/6 kV, power<br />

63/31. 5/31. 5 MW, which supply power to normal operation sections. For normal operation <strong>of</strong> the<br />

unit simultaneous operation <strong>of</strong> both auxiliary trans<strong>for</strong>mers is required, i.e. both auxiliary<br />

trans<strong>for</strong>mers <strong>for</strong> one unit are considered as one element in terms <strong>of</strong> reliability.<br />

Electric power supply loads in <strong>Kozloduy</strong> <strong>NPP</strong> units 5 and 6 are divided into 3 categories,<br />

according to their consumed electricity and the extent <strong>of</strong> reliability <strong>of</strong> power supply:<br />

· Category I loads - AC and DC power loads, not allowing under safety conditions<br />

power outages <strong>for</strong> more than one semi-period – 20 ms in all modes, including mode <strong>of</strong> total<br />

loss <strong>of</strong> alternate current voltage from the working and backup auxiliary trans<strong>for</strong>mers<br />

(blackout mode);<br />

· Category II loads - AC and DC power loads, which have increased requirements to<br />

the reliability <strong>of</strong> electricity supply, and allowing <strong>for</strong> power outages <strong>for</strong> a time determined by<br />

the nuclear safety conditions up to 1 min (time <strong>for</strong> startup <strong>of</strong> DG and automatic startup <strong>of</strong><br />

loads with triggered load system);<br />

· Category III loads – AC power loads, which do not have higher requirements on the<br />

reliability <strong>of</strong> power supply than the requirements <strong>for</strong> presence <strong>of</strong> automatic switch to backup<br />

equipment.<br />

1.3.2.5.2 Backup power supply<br />

1.3.2.5.2.1 Backup power supply sources<br />

40/202