“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

In case <strong>of</strong> loss <strong>of</strong> <strong>of</strong>f-site power supply safety-related consumers are powered from independent<br />

emergency power supply sources located at area <strong>of</strong> units 5 and 6.<br />

· Emergency DGs<br />

Each <strong>of</strong> the units 5 and 6 has three automated diesel-generators, per one <strong>for</strong> each <strong>of</strong> the<br />

safety system trains. According to section 3 and section 8 <strong>of</strong> [7] and [8], the diesel generators are<br />

class 3 by OPB-88/97 and IAEA definition <strong>for</strong> safety functions, respectively, class Е1 by IEEE, and<br />

comply with respective seismic category 1. They are located at the site level. Consumers which are<br />

supplied from emergency DGs are safety systems, SFP cooling pumps and fire-protection pumps.<br />

· Accumulator batteries<br />

Power to the first category consumers during all operational modes, including complete loss<br />

<strong>of</strong> power supply mode, is provided from the accumulator batteries. Accumulator batteries energize<br />

the I&C in the reactor compartment, primary steam-gas mixture emergency removal system, BRU-<br />

A and emergency lighting.<br />

Reliable power supply system <strong>for</strong> the bank pumping station is intended to supply power to<br />

consumers related nuclear and fire safety (emergency service water pumps, shaft pumping stations,<br />

fire-annunciation installation and fire extinguishing in BPS and their supporting systems). Dieselgenerator<br />

station in the BPS is equipped with two diesel-generator sets.<br />

There are two accumulator batteries installed in the BPS which serve to guarantee<br />

uninterrupted power supply to the most important consumers ensuring accident-free operation <strong>of</strong><br />

facilities in the BPS shop.<br />

5.1.1.1.2 Independency <strong>of</strong> emergency power supply and measures to prolong operational time<br />

period<br />

· Emergency DGs – At operation <strong>of</strong> two emergency DGs (one per the unit) total capacity <strong>of</strong><br />

fuel and oil <strong>of</strong> the emergency DGs is sufficient <strong>for</strong> more than 38 days.<br />

· Accumulator battery – No need to undertake measures to prolong operational time period <strong>of</strong><br />

the accumulator batteries. See description in par. 1.3.2.6.1. „Accumulator batteries“.<br />

· DG <strong>of</strong> the BPS – Total reserve <strong>of</strong> fuel and oil at the BPS site ensure uninterrupted operation<br />

<strong>of</strong> both DGs during 56 hours and 45 minutes.<br />

5.1.1.2 Loss <strong>of</strong> <strong>of</strong>f-site power supply and loss <strong>of</strong> emergency diesel-generators<br />

5.1.1.2.1 Design schemes <strong>of</strong> permanently installed sources <strong>of</strong> additional emergency power<br />

supply to the site, capacity and availability <strong>for</strong> putting into operation<br />

Each <strong>of</strong> the two units has one additional independent diesel-generator with nominal power<br />

<strong>of</strong> 5.2 MW. According to the design these DGs are intended to ensure voltage to normal power<br />

supply busbars, through which – in case <strong>of</strong> loss <strong>of</strong> secondary circuit normal make-up – heated water<br />

is supplied to the SG from the deaerators, instead <strong>of</strong> cool water from the reservoirs <strong>of</strong> the secondary<br />

circuit emergency make-up system. In the same way thermal stresses in the SG tubing are<br />