“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

supply system through a pair <strong>of</strong> channels. Water from Danube River is delivered to the cold channel<br />

by pumps, located in bank pump stations.<br />

Redundancy to connection to the Danube River is provided by Emergency pump station,<br />

which ensure independent water supply in emergency reserve <strong>of</strong> the cold channel through two<br />

independent pressure steel water lines.<br />

Water <strong>for</strong> cooling <strong>of</strong> turbine condensers and <strong>for</strong> cooling <strong>of</strong> consumers in nuclear facilities is<br />

delivered by circulation pumping stations with intake chambers and pumps, pressure steel pipelines<br />

and filtering premises with filtering units. Facilities <strong>for</strong> removal <strong>of</strong> heated water are the removal<br />

steel pipelines, siphon spillways shafts, low pressure removal channels, outlet shaft with the intake<br />

chamber and overflow, inlet and inspection shafts. For the needs <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> totally 4<br />

circulation pumping stations (CPS) were constructed: one per two shutdown pairs <strong>of</strong> units 1-2 and<br />

3-4 (VVER-440) and one per each <strong>of</strong> two nuclear power units 5 and 6 (VVER-1000).<br />

CPS 3 and CPS 4 service the operating units, correspondingly unit 5 and unit 6. Two<br />

pumping station are identical. Each pump station has the following:<br />

· Motor-driven pumps <strong>for</strong> cooling <strong>of</strong> turbine condensers with water intake at elevation<br />

<strong>of</strong> 29 m;<br />

· Motor-driven pumps <strong>for</strong> service water supply to normal operation system consumers<br />

in the turbine hall, reactor compartment, auxiliary building and chemically demineralised<br />

water system with water intake at elevation <strong>of</strong> 28 m;<br />

· Motor-driven pumps <strong>for</strong> water supply to the spray pools with water intake at<br />

elevation <strong>of</strong> 28 m;<br />

· Diesel-pumps <strong>for</strong> water supply to the spray pools with water intake at elevation <strong>of</strong><br />

26.3 m, virtually from the bottom <strong>of</strong> the cold channel;<br />

· Fire-protection pumps with water intake at elevation <strong>of</strong> 26.3 m, virtually from the<br />

bottom <strong>of</strong> the cold channel.<br />

Series <strong>of</strong> the design measures have been implemented to prevent loss <strong>of</strong> connection to the<br />

Danube River – measures to prevent loss <strong>of</strong> the pumping stations, tools to prevent blocking <strong>of</strong> the<br />

main cooling water inlet, alternative ways <strong>of</strong> water supply, etc.<br />

Redundancy <strong>for</strong> removal <strong>of</strong> spent service water from <strong>NPP</strong> site (units 5 and 6) to the Danube<br />

River is provided with the second warm channel.<br />

For water supply to the spray pools <strong>of</strong> units 5 and 6, independent water supply is provided<br />

from the terrace <strong>of</strong> the Danube river, 6 shaft wells and 6 shaft pumping stations. Water amount<br />

which can be delivered from the shaft pumping stations to the spray pools is sufficient to replenish<br />

<strong>for</strong> losses from the six spray pools due to steaming and entrainment at quiet weather (wind speed <strong>of</strong><br />

2 m/s). Water from the shaft pumping station is delivered to the spray pools via separate steel<br />

pipeline.<br />

Cooling <strong>of</strong> the consumers <strong>of</strong> units 5 and 6 is provided from:<br />

147/202