“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

Figure 1.6-2: OSY 400 kV, Units 5 and 6<br />

Over Head Transmission Lines<br />

Line Breakers<br />

Autotrans<strong>for</strong>mer<br />

“Chetnik”<br />

“Pioner”<br />

”Chiren”<br />

”Varshetz”<br />

Open<br />

Switchyard<br />

400 kV<br />

Open<br />

Switchyard<br />

400 kV<br />

Open<br />

Switchyard<br />

220 kV<br />

Turbo generator 9<br />

Main Trans<strong>for</strong>mers<br />

Unit 5<br />

Additional DG<br />

First Back Up Power<br />

Supply Unit 5<br />

and Second Up Power<br />

Supply Unit 6<br />

From Open<br />

Switchyard 220 kV<br />

First Back Up Power<br />

Supply Unit 6<br />

and Second Up Power<br />

Supply Unit 5<br />

From Open<br />

Switchyard 220 kV<br />

Turbo generator 10<br />

TG-5<br />

Main Trans<strong>for</strong>mers<br />

Unit 6<br />

3TP<br />

Additional DG<br />

Power Supply from<br />

Additional DG<br />

In House Trans<strong>for</strong>mer<br />

Unit 5<br />

Power Supply from<br />

Additional DG<br />

In House Trans<strong>for</strong>mer<br />

Unit 6<br />

2 nd Back Up<br />

Power Supply<br />

1 st Back Up<br />

Power Supply<br />

Main Power<br />

Supply<br />

Main Power<br />

Supply<br />

1 st Back Up<br />

Power Supply<br />

DG - 1 Train<br />

DG - 2 Train<br />

DG - 3 Train<br />

DG - 1 Train<br />

DG - 2 Train<br />

DG - 3 Train<br />

2 nd Back Up<br />

Power Supply<br />

Mobile DG<br />

Additional Emergency<br />

Feedwater Pump<br />

Batteries - Safety<br />

System 1, 2, 3 Train<br />

Mobile DG<br />

Additional Emergency<br />

Feedwater Pump<br />

Batteries - Safety<br />

System 1, 2, 3 Train<br />

56/202