17.04.2015 Views

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

For per<strong>for</strong>ming the tasks by the <strong>for</strong>ced involved, Manager <strong>of</strong> Emergency response activities<br />

via Manager <strong>of</strong> support services alerts the technical managers in the situation through provision <strong>of</strong><br />

the following data:<br />

· in<strong>for</strong>mation on radiation situation and accident progress;<br />

· schemes <strong>of</strong> moving routes and facilities where tasks will be per<strong>for</strong>med;<br />

· dispatching <strong>of</strong> divisions to preliminary defined objects in vicinity <strong>of</strong> accident<br />

location and instructing in the situation;<br />

· support by radiation monitoring specialists;<br />

· data exchange <strong>for</strong> maintaining uninterrupted connection and control.<br />

Manager <strong>of</strong> Emergency response activities maintains uninterrupted interfacing and receives<br />

in<strong>for</strong>mation from Evacuation Committee <strong>of</strong> Municipality (Obshtina) <strong>Kozloduy</strong> <strong>for</strong> evacuation <strong>of</strong><br />

plant personnel and their families in accordance with envisioned in National emergency plan<br />

deadlines and settlements.<br />

Entire activity on organization <strong>of</strong> interfaces <strong>for</strong> conducting <strong>of</strong> localizing, rescue, protection<br />

and liquidation measures at beyond design basis, severe accident in «<strong>Kozloduy</strong> <strong>NPP</strong>» plc is<br />

provided by the Chairmen <strong>of</strong> NHCC who coordinates and manages activities <strong>of</strong> involved <strong>for</strong>ces and<br />

means, and the line management <strong>of</strong> divisions is delivered the technical managers.<br />

Organization <strong>of</strong> interfaces and management <strong>of</strong> involved <strong>for</strong>ces and means <strong>for</strong> conducting <strong>of</strong><br />

localizing, rescue, protection and liquidation measures at the site <strong>of</strong> «<strong>Kozloduy</strong> <strong>NPP</strong>» plc is<br />

provided by Manager <strong>of</strong> Emergency response activities.<br />

6.11-1 <strong>of</strong> [28].<br />

General interface scheme at executing <strong>of</strong> joint tasks is shown in Appendix 6.9-1 <strong>of</strong> [28].<br />

<strong>Summary</strong> time schedule <strong>for</strong> conducting <strong>of</strong> Emergency measures is provided in Appendix<br />

Table 6.1-1: General time schedule <strong>for</strong> emergency measures implementation<br />

№ Emergency measure<br />

Implementati<br />

on deadline<br />

Per<strong>for</strong>mer<br />

1 Initial assessment <strong>of</strong> the initiating event Tclass.= T 0 Unit<br />

(Accident classification)<br />

+<br />

supervisor,<br />

(T 0 is accepted to be the time <strong>of</strong> event £ 15 min operational<br />

occurrence )<br />

personal<br />

2 Emergency personal level I, II and III<br />

notification<br />

3 Notification <strong>of</strong> municipal authorities after<br />

accident classification.<br />

Tclass. +<br />

£ 15 min<br />

Tклас +<br />

£ 15 min<br />

Telephone<br />

operator on<br />

duty<br />

GR1<br />

(ERM)<br />

Supervisor<br />

Shift<br />

supervisor(<br />

GR1 –<br />

ERM)<br />

Shift<br />

supervisor(<br />

GR1 –<br />

ERM)<br />

Notification NRA, National service <strong>of</strong> civil<br />

protection, Ministry <strong>of</strong> industry and energy,<br />

and Permanent Committee <strong>for</strong> civil protection<br />

against adversities, accidents and disasters<br />

T 0 + £ 1 h<br />

GR1<br />

(ERM)<br />

166/202

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!