Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

In emergencies, when implementation <strong>of</strong> lifesaving activities are required the limit <strong>of</strong> 100<br />

mSv may be exceeded. For example, actions to prevent core damage. In case <strong>of</strong> emergency<br />

activities involving very high risk, they are per<strong>for</strong>med by volunteers from the emergency personnel<br />

<strong>of</strong> the emergency teams. Furthermore, the head <strong>of</strong> the enterprise is obliged to submit to the Minister<br />

<strong>of</strong> Health and the Chairman <strong>of</strong> the NRA the statement accompanied by a list <strong>of</strong> staff who per<strong>for</strong>ms<br />

the operations, their written consent, time and place <strong>of</strong> operations, the opinion <strong>of</strong> the health or other<br />

medical establishment and any other in<strong>for</strong>mation about the circumstances and the measures taken.<br />

For the work <strong>of</strong> emergency personnel <strong>of</strong> the MCR (ECR) and AMC the design solutions<br />

provide habitability in the event <strong>of</strong> a radiological or nuclear accident. These solutions ensure<br />

protection against ionizing radiation, isolation from the environment, air purification from<br />

radioactive purification higher than the external atmospheric pressure, air-conditioning, etc. to<br />

ensure long-term safe stay <strong>of</strong> the personnel.<br />

6.1.3.2 Factors which can prevent management <strong>of</strong> accident <strong>of</strong> units 3 and 4<br />

6.1.3.2.1 Impact on accessibility and habitability <strong>of</strong> the MCR and SCR, measures to prevent or<br />

control the situation<br />

Control and management <strong>of</strong> the technological processes is provided by two main control<br />

rooms (one per each unit). in the technical design separated layout is adopted <strong>of</strong> the main control<br />

rooms which ensure:<br />

· high fire safety <strong>of</strong> the rooms;<br />

· higher reliability in control <strong>of</strong> each unit;<br />

· possibility <strong>of</strong> better cable lying.<br />

Besides design envisions two Standby control rooms (SCR), one per each unit, at which the<br />

units can be shut down in case <strong>of</strong> accident situation at the main control rooms.<br />

<strong>of</strong> the unit.<br />

At the MCR control is envisioned <strong>of</strong> all the main and auxiliary mechanisms and components<br />

At the MCR control is per<strong>for</strong>med <strong>for</strong> operating auxiliaries trans<strong>for</strong>mers 15,75/6,3 kV,<br />

switchgears 6 kV with standby power supply to 6 kV busbars, unit operating and standby<br />

trans<strong>for</strong>mers 6/0,4 kV, elements <strong>of</strong> the grid <strong>for</strong> reliable power supply to the units.<br />

At the MCR the following communications are provided:<br />

· two-way loudspeaking communication <strong>of</strong> duty operator and the shift <strong>of</strong> the operating<br />

personnel;<br />

· command loudspeaker and alarm in the main production premises and in area <strong>of</strong> the<br />

power plant.<br />

At the MCRs <strong>of</strong> the units conditioning systems are mounted <strong>for</strong> maintaining required<br />

conditions <strong>for</strong> uninterrupted work <strong>of</strong> the operators. This is combined with maintaining and setting at<br />

the MCR <strong>of</strong> the so called “working” are <strong>for</strong> the MCR operators.<br />