“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

In<strong>for</strong>mation system <strong>of</strong> the AMC (IS <strong>of</strong> AMC) is set <strong>of</strong> hardware and s<strong>of</strong>tware (firmware)<br />

means <strong>for</strong> in<strong>for</strong>mation support (ensuring in<strong>for</strong>mation and data exchange) between the management<br />

team <strong>of</strong> the emergency activities and the emergency personnel in the AMC.<br />

IS <strong>of</strong> AMC receives input data from these systems <strong>for</strong> monitoring <strong>of</strong> safety-related<br />

parameters, automated radiation monitoring systems <strong>of</strong> the <strong>NPP</strong> and meteorological observation<br />

system.<br />

Generated input data is used <strong>for</strong> assessment <strong>of</strong> the condition <strong>of</strong> facilities, radioactive releases<br />

and dose rates to public, and is required <strong>for</strong> decision-making and application <strong>of</strong> protection<br />

measures.<br />

8. Means <strong>for</strong> annunciation and communication means:<br />

«<strong>Kozloduy</strong> <strong>NPP</strong>» plc - in case <strong>of</strong> initiation <strong>of</strong> the Emergency Plan - has available the<br />

advanced annunciation system which is intended to assure qualitative and reliable annunciation at<br />

the <strong>NPP</strong> site, as well as <strong>for</strong> settlements within 12 km area.<br />

If required all other process means are used (pager, radiostation, <strong>of</strong>fice telephone, home<br />

telephone, mobile telephone) <strong>for</strong> in<strong>for</strong>mation, telephone and radio exchange and loudspeakers, with<br />

which it is possible to announce the personnel, managing authorities and public.<br />

6.1.3 Evaluation <strong>of</strong> factors which can prevent management <strong>of</strong> accident and not envisioned<br />

circumstances<br />

6.1.3.1 Factors impacting all nuclear structures at the site<br />

6.1.3.1.1 Significant damages on infrastructure or flooding in vicinity <strong>of</strong> the plant which may<br />

prevent access to it<br />

On the basis <strong>of</strong> assessments done in relation with „Earthquakes” within the range <strong>of</strong> seismic<br />

impacts 0,26 < PGA ≤ 0,36g which is significantly beyond design 0,2 g, significant failures and<br />

damages are expected to seismically non-qualified structures and structures at the site. At the site, at<br />

this level <strong>of</strong> seismic impacts it is probable that all administrative buildings designed according to<br />

general industrial regulations (Administrative Building, Engineering Laboratory Building, medical<br />

centre) will be severely damaged and not available, and it is probable that seismically non-qualified<br />

process trestles will fail. There is a probability <strong>of</strong> failure to the bridges above the cold channel, and<br />

in this case direct connection between Electric production 1 and Electric production 2 may fail.<br />

Such damages shall be expected also to buildings and infrastructure in vicinity <strong>of</strong> the site.<br />

Due to beyond design basis seismic impacts it is highly probable that the hospital and fire<br />

protection building in the town won’t function normally. These secondary effects from the<br />

combined impact <strong>of</strong> the earthquake and sequential flooding shall be considered at planning <strong>of</strong><br />

Emergency actions and at diversification <strong>of</strong> evacuation routes, delivery <strong>of</strong> required fuel and<br />

materials to the plant, at assessment <strong>of</strong> access <strong>of</strong> the shift personnel.<br />