17.04.2015 Views

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

2.9.3 General process <strong>for</strong> ensuring SSCs required <strong>for</strong> maintaining the units in safe shutdown<br />

state after earthquake<br />

Under the licensing documents and in accordance with licensing requirements and<br />

conditions, <strong>Kozloduy</strong> <strong>NPP</strong> as the operating organization has developed a system <strong>of</strong> technical and<br />

organizational measures to maintain proper condition <strong>of</strong> safety related SSCs through diagnostics,<br />

per<strong>for</strong>ming preventive measures, maintenance, repair, testing, inspections and operational control,<br />

replacing the structures and components with service life expired. A system <strong>for</strong> documenting the<br />

results <strong>of</strong> the activities per<strong>for</strong>med and the operational control has been established.<br />

For qualification <strong>of</strong> all safety related SSCs <strong>of</strong> nuclear facilities a continuous process has<br />

been created involving archiving (passports factory instructions), documentating (plans, programs,<br />

instructions) and maintaining data (functional tests, avalability acts, monitoring) to ensure ability <strong>of</strong><br />

the equipment to per<strong>for</strong>m its functions during its entire lifetime. This process is started with the<br />

design <strong>of</strong> the nuclear facilities and will continue until the end <strong>of</strong> their lifetime taking into account<br />

the aging <strong>of</strong> SSCs, modifications, repair, service history, failures <strong>of</strong> components, replacement <strong>of</strong><br />

components and distortions in the normal operating conditions.<br />

At Units 5 and 6 "The list <strong>of</strong> SSCs classified according to safety, seismicity and quality”<br />

[94] has been approved.<br />

Maintenance and repairs in the <strong>Kozloduy</strong> <strong>NPP</strong> are per<strong>for</strong>med by highly qualified and trained<br />

personnel. The purpose <strong>of</strong> maintenance and repair is to ensure that SSCs are able to per<strong>for</strong>m their<br />

design functions and maintain the design features in accordance with the technical specifications <strong>of</strong><br />

nuclear facilities.<br />

Activities <strong>for</strong> maintenance and repair include:<br />

· planning <strong>of</strong> maintenance and repair;<br />

· carrying out planned maintenance and repair;<br />

· emergency repairs and removal <strong>of</strong> defects;<br />

· quality control in maintenance and repair.<br />

Scheduled maintenance and repair are per<strong>for</strong>med to maintain and restore the equipment and<br />

its components. These activities are consistent with the requirements <strong>of</strong> manufacturers, regulators<br />

and normative-technical documents, have a certain periodicity and specified scope and cover the<br />

following types <strong>of</strong> maintenance and repair: general overhaul, intermediate repair, routine repair, and<br />

planned preventive maintenance.<br />

The frequency and the scope <strong>of</strong> scheduled maintenance and repair are determined according<br />

to their importance to safety, technical specifications and operating instructions containing the<br />

operating limits <strong>of</strong> reliability <strong>of</strong> equipment and systems, results <strong>of</strong> current monitoring and periodic<br />

functional tests, periodic analyses <strong>of</strong> the failures occurred and trends <strong>of</strong> important process<br />

parameters and indicators <strong>for</strong> safe operation.<br />

87/202

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!