“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

The SG alternative makeup system to ensure primary circuit heat removal only during time a<br />

little over 24 hours [90]. This time is fully sufficient <strong>for</strong> cooldown <strong>of</strong> one unit to cold state. In spite<br />

<strong>of</strong> this, it should be taken into account that the use <strong>of</strong> SG alternative makeup system depends on<br />

capability <strong>of</strong> MDG to move to the point <strong>of</strong> connection.<br />

For other units (to which MDG is not connected) the heat removal function to the secondary<br />

circuit can be used after reaching <strong>of</strong> the water level to <strong>Kozloduy</strong> <strong>NPP</strong> site. In this case, to prevent<br />

from heating <strong>of</strong> the reactor installation and to recover the reactor core cooling, the operating<br />

personnel shall use instructions <strong>for</strong> effective recovery from SBEOPs package (see instructions<br />

ВФЗ-2.1 and ВФЗ-3.1.), [101] and [102].<br />

In the most general case, the actions are limited to cooldown <strong>of</strong> the reactor installation to<br />

150°С and lowering the primary circuit pressure to parameters at which it is possible to connect<br />

emergency normal cooldown, [101] and [102], i.e. to per<strong>for</strong>mance <strong>of</strong> feed-and-bleed procedure.<br />

Obviously, when discussing scenario <strong>of</strong> combination <strong>of</strong> beyond design basis earthquake<br />

with beyond design basis flooding <strong>of</strong> major importance is the time <strong>for</strong> the water level reaching to<br />

<strong>Kozloduy</strong> <strong>NPP</strong> site and the time <strong>for</strong> flooding elevation - 4,20, i.e. the time from the earthquake to<br />

achieving the emergency feedwater pumps failure.<br />

According to the analyse [89] it can be demonstrated that about 20 hours are available from<br />

the destruction <strong>of</strong> water supply systems “Iron Gates” 1 and 2 to the reaching <strong>of</strong> the water level to<br />

the kilometre <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> site. Obviously, it can be anticipated that the loss <strong>of</strong> emergency<br />

feedwater pumps will be occur at the end <strong>of</strong> the reactor cooldown or after its completion (depending<br />

on the cooldown speed, selected by the operating personnel). There<strong>for</strong>e, based on the analyses [34]<br />

it can be accepted that the water inventories in the SGs are sufficient <strong>for</strong> successful completion <strong>of</strong><br />

cooldown and per<strong>for</strong>mance <strong>of</strong> actions in ВФЗ-2.1 [101] and ВФЗ-3.1 [102].<br />

Ensuring stable over time cooling <strong>of</strong> the reactor core <strong>for</strong> a period <strong>of</strong> 72 hours without<br />

external supply can be achieved when the unit is cooled to cold state and core cooling is provided<br />

through emergency and normal cooldown system and the heat from the emergency core cooling<br />

system heat-exchanger is removed from the essential components service water supply system to<br />

the ultimate heat sink – water in spray pools.<br />

The water in the spray pools and operational inventories <strong>of</strong> diesel fuel <strong>of</strong> the site are<br />

sufficient to ensure safe condition <strong>of</strong> the reactor in cold state <strong>for</strong> 7 days without additional supplies.<br />

The core cooling function by primary circuit will be affected by the combination <strong>of</strong> the<br />

external events, as follows:<br />

· unit 5: per<strong>for</strong>mance <strong>of</strong> the function <strong>for</strong> the line <strong>of</strong> scheduled and maintenance<br />

cooldown will be limited to two trains <strong>of</strong> Unit 5 emergency and scheduled cooldown<br />

system. Due to flooding <strong>of</strong> ShPS, the inventories in the spray ponds ensure 60 hours’<br />

per<strong>for</strong>mance <strong>of</strong> the function at stage by stage switching <strong>of</strong> the available trains;<br />