17.04.2015 Views

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

Figure 1.2-1: SFP <strong>of</strong> units 3 and 4<br />

Vaporized Cooling to<br />

Atmosphere<br />

Spray Pool<br />

Spend Fuel Tank<br />

Heat exchanger<br />

Pump<br />

Pump<br />

Spend Fuel tank Cooling<br />

Service Water Group A<br />

From Danube River<br />

(Cold Canal)<br />

to the Cold Canal<br />

Spray Pool<br />

Heat exchanger<br />

Pump<br />

Spend Fuel tank Cooling<br />

Pump<br />

Service Water Group A<br />

From Danube River<br />

(Cold Canal)<br />

to the Cold Canal<br />

18/202

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!