“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

At loss <strong>of</strong> all SFS power supply sources procedure <strong>for</strong> electric power supply to the required<br />

0,4 kV loads <strong>of</strong> the SFS systems from the diesel-generator is applied [29].<br />

1.4.2.7.4.4 Availability, parameters and characteristics <strong>of</strong> alternative power supply sources<br />

and related restrictions<br />

The mobile diesel-generator is provided with fuel and oil inventory <strong>for</strong> continuous nominal<br />

load operation <strong>for</strong> about 10 hours [30]. The emergency inventory <strong>of</strong> the fuel is stored in the oil<br />

stocks <strong>of</strong> Units 5 and 6 site.<br />

1.4.2.7.4.5 Preparedness to use alternative power supply sources<br />

In <strong>Kozloduy</strong> <strong>NPP</strong> special procedure is developed specifying electric power supply from<br />

mobile diesel generator [30]. Movement <strong>of</strong> the plat<strong>for</strong>m with mobile diesel generator from the hall<br />

to SFS is carried out by a carrier and is organized by the manager <strong>of</strong> support service according to<br />

<strong>Kozloduy</strong> <strong>NPP</strong> Emergency Plan [28].<br />

1.4.2.8 DC power supply<br />

1.4.2.8.1 UPS devices – description, capacity, discharge time<br />

In order to provide <strong>for</strong> short-term disturbances in the power supply to sensitive loads in SFS,<br />

<strong>for</strong> the time be<strong>for</strong>e power supply from backup diesel-generator UPS devices are installed [31].<br />

1.4.2.8.2 Loads powered from the UPS devices<br />

The loads powered from the UPS devices are as follows: radiation monitoring interlocks and<br />

protections system, control room workstation, electric equipment in refuelling machine cabin.<br />

1.4.2.8.3 Location and separation <strong>of</strong> UPS devices. Protection against external and internal<br />

impacts<br />

requirements.<br />

The UPSs location is commensurate with their purpose and meet the fire protection<br />

1.4.2.8.4 Alternative options <strong>for</strong> the batteries recharging<br />

The design does not provide <strong>for</strong> alternative option <strong>for</strong> UPSs batteries recharging.<br />