“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

· Medium pressure emergency boron injection system;<br />

· Emergency and normal core cooldown system;<br />

· Passive emergency core cooldown system;<br />

· Primary circuit overpressure protection;<br />

· Secondary circuit overpressure protection;<br />

· Primary circuit emergency gas removal system;<br />

· SG emergency makeup water supply system;<br />

· Containment;<br />

· Spray system;<br />

· Pressure reduction filtering system;<br />

· Hydrogen concentration control and reduction system;<br />

· Essential components service water supply system;<br />

· Supporting ventilation systems;<br />

2.5.1.2.1.2 Reactor<br />

The systems and components classification is per<strong>for</strong>med in the framework <strong>of</strong> modernization<br />

<strong>of</strong> Units 5 and 6 <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong>. The reactor and the internals has been originally designed<br />

considering seismic impact <strong>of</strong> 9 points by MSK-64 scale, item 3.13.4 [7],[8], item 6.3.3 [67].<br />

According to item 6.3.3 [67] these requirements are specified in the Terms <strong>of</strong> Reference (ToR) and<br />

confirmed. Item 4.7 [7],[8] summarizes the actions per<strong>for</strong>med <strong>for</strong> the reactor modernization with<br />

regard to the Modernization Programme <strong>of</strong> Units 5 and 6. The equipment seismic qualification has<br />

been reviewed in the framework <strong>of</strong> the modernization programme [7],[8] and [67].<br />

2.5.1.2.1.3 Reactor building major equipment<br />

The major equipment in the reactor building has been designed considering the seismic<br />

impact loads from 9 points by MSK-643 scale [7] and [8]. Item 5.5 [7],[8] summarizes the actions<br />

completed <strong>for</strong> modernization <strong>of</strong> the primary circuit and related systems with regard to the<br />

modernization programme <strong>of</strong> Units 5 and 6.<br />

Under the modernization programme analysis <strong>of</strong> the behaviour and calculation <strong>of</strong> the<br />

seismic resistance <strong>of</strong> the major equipment and the safety systems equipment was per<strong>for</strong>med and<br />

proposals developed <strong>for</strong> required rein<strong>for</strong>cements, item 6.3.3 [67], item 3.13.4 [7],[8].<br />

The seismic qualification <strong>of</strong> the pipelines, equipment and fixing elements <strong>of</strong> the primary<br />

circuit has been reviewed in a number <strong>of</strong> measures under the modernization programme with the<br />

results are summarized considering the new seismic requirements <strong>for</strong> the site. Qualification <strong>of</strong> the<br />

following primary circuit equipment was confirmed:<br />

· Main circulation lines;<br />

· Steam generators;<br />

· Reactor coolant pumps.<br />