“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

Option<br />

2 Shut down reactor, planned cooldown at pressurized primary<br />

circuit and drained SG<br />

(Considered: drainage <strong>of</strong> three hydro accumulators)<br />

3 Shut down reactor, planned cooldown at pressurized primary<br />

circuit and non-drained SG<br />

(Considered: drainage <strong>of</strong> three hydro accumulators, make-up <strong>of</strong><br />

SG from high pressure deaerator, chemically demineralised water<br />

system tanks and SG emergency make-up system tanks)<br />

4 Shut down reactor, planned cooldown at depressurized primary<br />

circuit<br />

(Considered: drainage <strong>of</strong> three hydro accumulators)<br />

Time to fuel<br />

damage<br />

(h:min)<br />

16:44<br />

More than 3 days<br />

and 19 hours<br />

19:45<br />

5<br />

Shut down reactor, outage cooldown<br />

(Considered: drainage <strong>of</strong> three hydro accumulators)<br />

3 days after shutdown 25:51<br />

18 days after shutdown 50:12<br />

The first threshold is discharge <strong>of</strong> the accumulator batteries (about 10 hours after complete<br />

loss <strong>of</strong> AC sources). As a result the shift personnel losses in<strong>for</strong>mation on unit parameters. Be<strong>for</strong>e<br />

that the valves required <strong>for</strong> accident management shall be positioned (safety valves <strong>of</strong> the<br />

pressurize, BRU-A, steam/gas mixture emergency removal line, etc.).<br />

However, discharge <strong>of</strong> the accumulator batteries does not terminate the started processes <strong>of</strong><br />

heat removal (motor-driven pumps will maintain their position).<br />

The second threshold is water exhaust in chemically demineralised water tanks (at pump<br />

make-up <strong>of</strong> SG auxiliary make-up system) and in the tanks <strong>of</strong> SG emergency make-up system (at<br />

make-up using SG EMS).<br />

At power operations exhaust <strong>of</strong> the three SG emergency make-up system tanks, <strong>of</strong> high<br />

pressure deaerator water reserve and chemically demineralised water tank is expected after more<br />

than 3 days.<br />

The third threshold is exhaust <strong>of</strong> fuel oil reserve <strong>for</strong> additional and mobile DG. Fuel oil<br />

reserve <strong>for</strong> additional DG is sufficient <strong>for</strong> more than 4 days, and <strong>for</strong> MDG – <strong>for</strong> 60 hours. Oil<br />

reserves <strong>for</strong> both DGs are sufficient <strong>for</strong> this period <strong>of</strong> time. If emergency DGs are inoperable, oil<br />

and fuel intended <strong>for</strong> these can be used on the operating DGs, with which their operation is ensured<br />

<strong>for</strong> more than 30 days.<br />