“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

[73] НП-031-01, Regulations on design <strong>of</strong> the seismically stable nuclear plants. Moscow,<br />

2001<br />

[74] РИ/ДИ-216 rev.1, System <strong>for</strong> seismic monitoring and control <strong>of</strong> unit 6 <strong>of</strong> <strong>Kozloduy</strong><br />

<strong>NPP</strong>. Plan <strong>for</strong> actions <strong>of</strong> the personnel during the earthquake. Definition <strong>of</strong> current<br />

criteria on exceeding <strong>of</strong> DBE, September 2002<br />

[75] ДОД.АГ.ПЛ.781, National protection plan at disasters. Part III. Off-site emergency<br />

plan <strong>of</strong> the <strong>Kozloduy</strong> <strong>NPP</strong>“<br />

[76] 30.ОБ.00.АИ.05/0, Actions plan <strong>of</strong> the personnel during and after the earthquake,<br />

[77] 35.ОБ.00.АИ.15/1, Emergency instruction <strong>for</strong> actions <strong>of</strong> NUDE at earthquake,<br />

[78] 35.ОБ.00.САП.02/0, Event-oriented emergency procedure on actions <strong>of</strong> NUDE at<br />

earthquake, Identification, MT. <strong>Kozloduy</strong>, 2011<br />

[79] Act <strong>for</strong> per<strong>for</strong>ming <strong>of</strong> program No 11.30.ЕЧ.00.АПР.980<br />

[80] 35.АСУ.AZ.ИЕ.73/7, Operating instruction <strong>of</strong> reactor emergency and preventive<br />

protection instrumentation<br />

[81] 30.ОУ.ОК.ИК.43/1,Quality assurance instruction. Equipment inspection program <strong>of</strong><br />

units 5 and 6<br />

[82] 11.30.ЕЧ.00.РП.5583/0, Program <strong>for</strong> check <strong>of</strong> the technical condition <strong>of</strong> SSCs,<br />

intended to ensure power supply to EP-2 from EES, Identification<br />

[83] 11.35.ЕЧ.АВР20.АПР.921, Program per<strong>for</strong>ming act, Testing <strong>of</strong> time <strong>for</strong> availability<br />

from the AB through 5ЕА20 via discharge with actual load during the mode <strong>of</strong> station<br />

blackout (without diesel-generator 5GW)<br />

[84] ДОД.ЕД.ПМ.894/01, Working program <strong>for</strong> inspection and assessment <strong>of</strong> preparedness<br />

<strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> plc <strong>for</strong> control and mitigation <strong>of</strong> consequences <strong>of</strong> the beyond design<br />

basis accidents, <strong>of</strong>f-site and on-site impacts<br />

[85] ДОД.ЕД.ПМ.894/01, Preliminary report <strong>for</strong> per<strong>for</strong>ming <strong>of</strong> Working program <strong>for</strong><br />

inspection and assessment <strong>of</strong> preparedness <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong> plc <strong>for</strong> control and<br />

mitigation consequences <strong>of</strong> the beyond design basis accidents, <strong>of</strong>f-site and on-site<br />

impacts<br />

[86] NGPS4/2004/bg/0102, Measure 21121 Rev. B, <strong>Conduct</strong> <strong>of</strong> analysis <strong>of</strong> the<br />

consequences from on-site flooding. Study<br />

[87] “Analyses and activities to enhance safety at the <strong>NPP</strong> site-<strong>Kozloduy</strong>”, “Energoproekt”-<br />

S<strong>of</strong>ia, 1992<br />

[88] „Analysis and assessment <strong>of</strong> the impact from possible petrol explosion at departmental<br />

petrol station <strong>of</strong> the <strong>NPP</strong> to the adjacent facilities and structures in area <strong>of</strong> <strong>Kozloduy</strong><br />

<strong>NPP</strong>“ 09.2008<br />

[89] REL-880-IR-09-2, Specified position 3. Off-site flooding. Assessment <strong>of</strong> the margins<br />

<strong>of</strong> the plant at <strong>of</strong>f-site flooding<br />

[90] DTR-ENPR-0784, Preliminary safety analysis report: Alternative SG make-up system<br />

at complete loss <strong>of</strong> the AC sources, ENPRO CONSULT OOD, March 18, 2008<br />

[91] ДОД.УК.НК.01, K<strong>NPP</strong> Quality Management Handbook<br />

[92] ДОД.АЕЦ.ПОД.014 - Rules <strong>for</strong> arrangement and activities <strong>of</strong> K<strong>NPP</strong>.<br />

[93] Law <strong>for</strong> safe use <strong>of</strong> nuclear energy, Updated; ДВ, No. 63 dated 28.06.2002, amended<br />