11.07.2015 Views

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pakistan</strong> <strong>Economic</strong> <strong>Survey</strong> <strong>2011</strong>-<strong>12</strong>Table 14.13: Production of Coal, Share and Percentage ChangeFiscal YearImports Domestic Production TotalTones (000) % Share Tones (000) % Share Tones (000) % Change2001-02 1,081 24.5 3,328 75.48 4,409 9.02002-03 1,578 32.3 3,3<strong>12</strong> 67.73 4,890 10.92003-04 2,789 46.0 3,275 54.01 6,064 24.02004-05 3,307 41.9 4,587 58.11 7,894 30.22005-06 2,843 36.9 4,871 63.14 7,714 -2.32006-07 4,251 53.9 3,643 46.15 7,894 2.32007-08 5,987 59.2 4,<strong>12</strong>4 40.79 10,111 28.<strong>12</strong>008-09 4,652 55.4 3,738 44.55 8,390 -17.02009-10 4,658 57.2 3,481 42.77 8,139 -3.02010-11 4,267 55.3 3,450 44.71 7,717 -5.2Avg. 10 years 46.3 53.7 7.7July-Mar2010-11 3,500e 59.8 2,350e 40.2 5,850e −<strong>2011</strong>-<strong>12</strong> 2,700c 57.1 2,030c 42.9 4,730c -19.15Source: Hydrocarbon Development Institute of <strong>Pakistan</strong>e: Coal data is estimated on the basis of six monthsc: Coal import is estimated on the bais of six months data while the production from FATA is not availableThe Federal and Prov<strong>in</strong>cial governments areendeavor<strong>in</strong>g to harness the huge coal resources ofThar by utiliz<strong>in</strong>g these as a source of energy forpower generation through <strong>in</strong>ternational <strong>in</strong>vestment.As part of the promotional activity to <strong>in</strong>crease theshare of coal, the Government of S<strong>in</strong>dh has leasedout a coal block for an <strong>in</strong>tegrated m<strong>in</strong><strong>in</strong>g project.The details are as under:-1. Government of S<strong>in</strong>dh has entered <strong>in</strong>to a jo<strong>in</strong>tventure with M/s Engro Powergen (Pvt.)Limited for Coal M<strong>in</strong><strong>in</strong>g <strong>in</strong> Block-II andestablished a Company under Companies Act,1984 viz. “ S<strong>in</strong>dh Engro Coal M<strong>in</strong><strong>in</strong>gCompany” for development of coal m<strong>in</strong>es and<strong>in</strong>stall<strong>in</strong>g 600-1000 MW Power Plant2. M/s Cougar Energy UK limited has beenallocated Block-III <strong>in</strong> Thar coalfield forextraction of under ground Coal Gasificationand establish<strong>in</strong>g a 400 MW power plant3. M/s B<strong>in</strong> Daen Group, UAE has been allocatedBlock-IV <strong>in</strong> Thar coalfield for coal m<strong>in</strong>e and<strong>in</strong>stall<strong>in</strong>g 1000 MW Power Plant4. One block has been allocated to Plann<strong>in</strong>gCommission of <strong>Pakistan</strong> for a Pilot Project of50 MW based on Underground CoalGasification Project <strong>in</strong> Block-V5. M/s Oracle Coalfield Plc, UK has beenallocated Block-VI <strong>in</strong> Thar coalfield fordevelop<strong>in</strong>g coal m<strong>in</strong>e and <strong>in</strong>stall<strong>in</strong>g powerplant of 300 MW extendable up to 1000 MW6. M/s Ch<strong>in</strong>a National Mach<strong>in</strong>ery Import andExport Corporation of Ch<strong>in</strong>a (CMC)conducted a feasibility study for 400 MW<strong>in</strong>tegrated coal m<strong>in</strong><strong>in</strong>g and coal fired powerplant at Sonda-Jerrick <strong>in</strong> district Thatta7. The Government of S<strong>in</strong>dh is enter<strong>in</strong>g <strong>in</strong>to aJo<strong>in</strong>t Venture with M/s Al-Abbas Groupcompany and allocated an area <strong>in</strong> Bad<strong>in</strong>coalfield for develop<strong>in</strong>g coal m<strong>in</strong>e and<strong>in</strong>stall<strong>in</strong>g Coal-fired Power Plant of 300-600MW14.4 Performance of Major Oil and GasCompaniesDur<strong>in</strong>g 1st July <strong>2011</strong> to 31st March 20<strong>12</strong>, sofar eight (8) oil and gas discoveries have beenmade <strong>in</strong> the country. Details are as under:210

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!