11.07.2015 Views

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

It is expected about Rs. 30.00 billion would beutilized on the water sector’s programmes underthe M<strong>in</strong>istry of Water and Power for <strong>2011</strong>-<strong>12</strong>. TheTable: 2.16: Major Water Sector Projects under ImplementationProjects Location TotalApp.cost(Rs. Inmillion)LiveStorage(MAF)Gomal Zam Dam KhyberPakhtunkhwaAgriculturefollow<strong>in</strong>g major water sector projects aredemonstrated <strong>in</strong> Table 2.16.IrrigatedArea(Acres)Latest Status(Expected up to June 20<strong>12</strong>)<strong>12</strong>,829 0.892 1, 91,139 75 % Physically completedGreater Thal Canal * Punjab 30,467 - 1,739,000Phase-I, completed(3 Phases)Ra<strong>in</strong>ee Canal * S<strong>in</strong>dh 18,862 - 4<strong>12</strong>,400(3 Phases)94 % Physically completedPhase-IKachhi Canal * Balochistan 31,204 - 713,000(3 Phases)62 % Physically completedPhase-IRais<strong>in</strong>g ofAJ&K62,553(O) 2.90 All overPhysically completedMangla Dam97,000 (B R)<strong>Pakistan</strong>Satpara Dam Skardu 4,397 0.05 15,536 Physically completedMulti- purposeRight Bank OutfallDra<strong>in</strong> (RBOD)RBOD-IRBOD-IIRBOD-IIIS<strong>in</strong>dhS<strong>in</strong>dhBalochistan14,70729,0146,53588% Physically Completed65% Physically Completed75% Physically CompletedSource: Plann<strong>in</strong>g & Development Division, Plann<strong>in</strong>g Commission* Progress of all three canals is for Phase-I, whereas app. cost is reflected for total project, Revised cost of all threecanals is un-approved, submitted for approval to P&D DivisionWater Sector Programmes dur<strong>in</strong>g (<strong>2011</strong>-<strong>12</strong>)These programmes are:Completion of phase-I of the Greater ThalCanal, substantial completion (60 percent) ofKachhi Canal <strong>in</strong> Balochistan and Ra<strong>in</strong>ee Canal(92 percent) <strong>in</strong> S<strong>in</strong>dh for irrigat<strong>in</strong>g 2.9 millionacres.Completion of Mangla Dam Rais<strong>in</strong>g Projectfor additional storage of 2.9 MAF andadditional power generation of 644 GWh.Completion of Satpara Dam <strong>in</strong> Gilgit Baltistanfor irrigation of 15,536 acres of agricultureland and 17.3 MW power generations.Substantial completion of Gomal Zam DamProject <strong>in</strong> Tribal/ Khyber Pakhtunkhwa (KPK)area for irrigation of 1, 91,139 acres ofagriculture land and generation of 17.4 MWpowerRs. 1,800 million is expected to be utilized onl<strong>in</strong><strong>in</strong>g various irrigation channels <strong>in</strong> Punjab,S<strong>in</strong>dh and Khyber Pukhtunkhwa dur<strong>in</strong>g theyear <strong>2011</strong>-<strong>12</strong>.An amount of Rs. 1,600 million is expected tobe utilized dur<strong>in</strong>g the year <strong>2011</strong>-<strong>12</strong> onimprovement of exist<strong>in</strong>g irrigat<strong>in</strong>g system <strong>in</strong>Punjab, S<strong>in</strong>dh, KPK and Balochistan.More than Rs. 2.00 billion is expected to beutilized on construction of new small tomedium sized dams across <strong>Pakistan</strong>; (W<strong>in</strong>der,Darwat, Nai Gaj and Naulong dam).In Balochistan, about Rs. 3.00 billion areexpected to be spent on the construction ofnew small, delay action dams andimprovement of exist<strong>in</strong>g irrigation system andflood schemes.In the dra<strong>in</strong>age sector, cont<strong>in</strong>ued fast trackimplementation of the RBOD-1, II & IIIprojects hope to protect and reclaim 4.90million acres of irrigated land.27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!