11.07.2015 Views

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pakistan</strong> <strong>Economic</strong> <strong>Survey</strong> <strong>2011</strong>-<strong>12</strong>projects. Guidel<strong>in</strong>es for environmentalassessment have also been developed.Asian Development Bank has been taken onboardto provide guarantee to the w<strong>in</strong>d powerproject developers <strong>in</strong> order to mitigate thecountry risk.Local manufactur<strong>in</strong>g of micro w<strong>in</strong>d turb<strong>in</strong>e hasbeen started. Manufactur<strong>in</strong>g for large w<strong>in</strong>dturb<strong>in</strong>es is also be<strong>in</strong>g <strong>in</strong>itiated. The turb<strong>in</strong>etowers for the first project are be<strong>in</strong>gmanufactured <strong>in</strong> <strong>Pakistan</strong>.Issues related to f<strong>in</strong>anc<strong>in</strong>g of projects havebeen resolved and now lead<strong>in</strong>g f<strong>in</strong>anc<strong>in</strong>gagencies like International F<strong>in</strong>anceCorporation (IFC), Asian Development Bank(ADB), Organization of the PetroleumExport<strong>in</strong>g Countries (OPIC) and <strong>Economic</strong>Cooperation Organization (ECO) Trade Banketc. are offer<strong>in</strong>g f<strong>in</strong>anc<strong>in</strong>g to w<strong>in</strong>d powerprojects <strong>in</strong> <strong>Pakistan</strong>.Measures taken by <strong>Pakistan</strong> Council ofRenewable Energy Technologies (PCERT)dur<strong>in</strong>g this fiscal yearThe Council had also strived to strengthen itsdevelopmental efforts by <strong>in</strong>troduc<strong>in</strong>g variousprojects <strong>in</strong> the public sector for the developmentand promotion of suitable technologies to producematerials and devices <strong>in</strong> the field of RenewableEnergy despite the number of hurdles <strong>in</strong> thedevelopment and promotion of renewable energytechnologies. Some of the notable projects andtheir status are as under:Table 15.24: Projects by <strong>Pakistan</strong> Council of Renewable Energy Technologies (PCERT)No. Type Present Status Target <strong>2011</strong>-15 Target 2016-201. Micro-hydel Plants (MHP) <strong>in</strong> GilgitBaltistan, AJK & Khyber Pakhtonkhwaand Canal-falls485 units generat<strong>in</strong>g 8 MW (electrify<strong>in</strong>g 70,000houses)5 MW (electrify<strong>in</strong>g25000 houses)20 MW (electrify<strong>in</strong>g100,000 Houses)2. Biogas Plants Cook<strong>in</strong>g, light<strong>in</strong>gIrrigation and power generation3. Solar Water Heaters Manufactur<strong>in</strong>gthrough private sector with PCRETTechnical servicesSolar Dryers Manufactur<strong>in</strong>g throughprivate sector with PCRET TechnicalservicesSolar Cooker Manufactur<strong>in</strong>g throughprivate sector with PCRET Technicalservices4. PV Modules Production Manufactur<strong>in</strong>gthrough private sector with PCRETTechnical services4000 units. Produc<strong>in</strong>g 18000 M 3 /day 50,000 units.Produc<strong>in</strong>g 0.300million M 3 /dayDesigned & developed 05 different models ofSWH for commercialization.Designed & Developed 03 different models of20,100 & 500 Kg capacitiesDesigned & developed box and dish type solarcookers for commercializationDeveloped Solar Cell production capacities upto pilot scale.5. W<strong>in</strong>d Turb<strong>in</strong>es 100% subsidy 155 units of 0.5-10 KW capacity electrify<strong>in</strong>g1600 houses.Source: <strong>Pakistan</strong> Council of Renewable Energy Technology (PCERT)10,000 units (<strong>12</strong>5-260liters each)50,000 units.Produc<strong>in</strong>g 0.300million M 3 /day25000 units <strong>12</strong>5-260liters/day50,000 units 100,000 units100,000 units 200,000 units5 MW 20 MW1000 units 10 MWelectrify<strong>in</strong>g 50,000houses1000 Nos. 10 MWelectrify<strong>in</strong>g 50,000houses(i) Mega W<strong>in</strong>d Power ProjectsIn addition to the above mentioned projects, AEDBalso issued Letters of Intent (LoIs) to 43 IPPspursu<strong>in</strong>g development of w<strong>in</strong>d power projects.Land was allocated to 19 IPPs for 50 MW w<strong>in</strong>dpower projects each <strong>in</strong> Gharo Keti Bander W<strong>in</strong>dCorridor. Projects with a cumulative capacity ofapprox. 950 MW are at various stages ofdevelopment on these lands.(ii) BiodieselMa<strong>in</strong> achievements <strong>in</strong> this fiscal year are: Pilot Energy plantations for Biodieselcultivated on 650 acres under study; Biodiesel production <strong>in</strong>itiated with PSO;First Biodiesel ref<strong>in</strong>ery with the capacity of18,000 Tons / annum Capacity has been set upat Karachi.SRO 474(1)<strong>12</strong>008 exempts custom duties andsales tax on Biodiesel production equipmentand material.Amendments <strong>in</strong> OGRA Ord<strong>in</strong>ance for Biofuels pric<strong>in</strong>g approved.218

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!