47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...
47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...
47. Pakistan Economic Survey 2011-12 - Consultancy Services in ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Pakistan</strong> <strong>Economic</strong> <strong>Survey</strong> <strong>2011</strong>-<strong>12</strong>projects. Guidel<strong>in</strong>es for environmentalassessment have also been developed.Asian Development Bank has been taken onboardto provide guarantee to the w<strong>in</strong>d powerproject developers <strong>in</strong> order to mitigate thecountry risk.Local manufactur<strong>in</strong>g of micro w<strong>in</strong>d turb<strong>in</strong>e hasbeen started. Manufactur<strong>in</strong>g for large w<strong>in</strong>dturb<strong>in</strong>es is also be<strong>in</strong>g <strong>in</strong>itiated. The turb<strong>in</strong>etowers for the first project are be<strong>in</strong>gmanufactured <strong>in</strong> <strong>Pakistan</strong>.Issues related to f<strong>in</strong>anc<strong>in</strong>g of projects havebeen resolved and now lead<strong>in</strong>g f<strong>in</strong>anc<strong>in</strong>gagencies like International F<strong>in</strong>anceCorporation (IFC), Asian Development Bank(ADB), Organization of the PetroleumExport<strong>in</strong>g Countries (OPIC) and <strong>Economic</strong>Cooperation Organization (ECO) Trade Banketc. are offer<strong>in</strong>g f<strong>in</strong>anc<strong>in</strong>g to w<strong>in</strong>d powerprojects <strong>in</strong> <strong>Pakistan</strong>.Measures taken by <strong>Pakistan</strong> Council ofRenewable Energy Technologies (PCERT)dur<strong>in</strong>g this fiscal yearThe Council had also strived to strengthen itsdevelopmental efforts by <strong>in</strong>troduc<strong>in</strong>g variousprojects <strong>in</strong> the public sector for the developmentand promotion of suitable technologies to producematerials and devices <strong>in</strong> the field of RenewableEnergy despite the number of hurdles <strong>in</strong> thedevelopment and promotion of renewable energytechnologies. Some of the notable projects andtheir status are as under:Table 15.24: Projects by <strong>Pakistan</strong> Council of Renewable Energy Technologies (PCERT)No. Type Present Status Target <strong>2011</strong>-15 Target 2016-201. Micro-hydel Plants (MHP) <strong>in</strong> GilgitBaltistan, AJK & Khyber Pakhtonkhwaand Canal-falls485 units generat<strong>in</strong>g 8 MW (electrify<strong>in</strong>g 70,000houses)5 MW (electrify<strong>in</strong>g25000 houses)20 MW (electrify<strong>in</strong>g100,000 Houses)2. Biogas Plants Cook<strong>in</strong>g, light<strong>in</strong>gIrrigation and power generation3. Solar Water Heaters Manufactur<strong>in</strong>gthrough private sector with PCRETTechnical servicesSolar Dryers Manufactur<strong>in</strong>g throughprivate sector with PCRET TechnicalservicesSolar Cooker Manufactur<strong>in</strong>g throughprivate sector with PCRET Technicalservices4. PV Modules Production Manufactur<strong>in</strong>gthrough private sector with PCRETTechnical services4000 units. Produc<strong>in</strong>g 18000 M 3 /day 50,000 units.Produc<strong>in</strong>g 0.300million M 3 /dayDesigned & developed 05 different models ofSWH for commercialization.Designed & Developed 03 different models of20,100 & 500 Kg capacitiesDesigned & developed box and dish type solarcookers for commercializationDeveloped Solar Cell production capacities upto pilot scale.5. W<strong>in</strong>d Turb<strong>in</strong>es 100% subsidy 155 units of 0.5-10 KW capacity electrify<strong>in</strong>g1600 houses.Source: <strong>Pakistan</strong> Council of Renewable Energy Technology (PCERT)10,000 units (<strong>12</strong>5-260liters each)50,000 units.Produc<strong>in</strong>g 0.300million M 3 /day25000 units <strong>12</strong>5-260liters/day50,000 units 100,000 units100,000 units 200,000 units5 MW 20 MW1000 units 10 MWelectrify<strong>in</strong>g 50,000houses1000 Nos. 10 MWelectrify<strong>in</strong>g 50,000houses(i) Mega W<strong>in</strong>d Power ProjectsIn addition to the above mentioned projects, AEDBalso issued Letters of Intent (LoIs) to 43 IPPspursu<strong>in</strong>g development of w<strong>in</strong>d power projects.Land was allocated to 19 IPPs for 50 MW w<strong>in</strong>dpower projects each <strong>in</strong> Gharo Keti Bander W<strong>in</strong>dCorridor. Projects with a cumulative capacity ofapprox. 950 MW are at various stages ofdevelopment on these lands.(ii) BiodieselMa<strong>in</strong> achievements <strong>in</strong> this fiscal year are: Pilot Energy plantations for Biodieselcultivated on 650 acres under study; Biodiesel production <strong>in</strong>itiated with PSO;First Biodiesel ref<strong>in</strong>ery with the capacity of18,000 Tons / annum Capacity has been set upat Karachi.SRO 474(1)<strong>12</strong>008 exempts custom duties andsales tax on Biodiesel production equipmentand material.Amendments <strong>in</strong> OGRA Ord<strong>in</strong>ance for Biofuels pric<strong>in</strong>g approved.218